Similar Projects
James A. Campbell Park and Willow Lakes Park Restrooms
New Construction
Bidding
Fuquay-Varina, NC

Jackson Park Site Preparation/Development for Modular Pre-Fabricated Restroom Building
Post-Bid
Hendersonville, NC 28792

Refurbish Restroom Facility at Mid-Carolina Regional Airport
Post-Bid
Salisbury, NC

Modernize Bathrooms and Stairwells
Results
$25,000 to $100,000 est. value
Fort Bragg, NC

HV Brown Shelter and Restroom Construction
Results
Less than $209,136 est. value
Goldsboro, NC

Yogi Bear's Jellystone Park Resort
New Construction
Construction
Asheboro, NC 27205

Thomas Built Buses Restrooms
Renovation - 770 SF
Construction
$325,000 est. value
High Point, NC 27263

Nouryon Womens Locker Room and Breakroom
Renovation - 766 SF
Post-Bid
Salisbury, NC 28147

Restroom Facility at Frank Liske Park
New Construction - 616 SF
Results
$544,000 est. value
Concord, NC

KBI Biopharma Second Floor Restrooms
Renovation - 990 SF
Construction
Durham, NC 27704

Richmond Hill Park Improvements
Post-Bid
Less than $500,000 est. value
Asheville, NC 28806

Graham Recreational Complex- Phase Two
New Construction
Results
Less than $179,697 est. value
Graham, NC

Pinnacle Classical Academy Concessions/Restrooms
New Construction - 2,354 SF
Construction
$580,000 est. value
Shelby, NC 28152

Union Square and Downtown Block Structures and Lighting
Post-Bid
Hickory, NC

Jack Amyette Bathhouse Project
Results
Less than $138,700 est. value
Jacksonville, NC

Last Updated 02/05/2019 11:12 AM
Project Title

Lake Cammack Bathhouse

Physical Address View project details and contacts
City, State (County) Burlington, NC 27217   (Alamance County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Demolition of existing swimming pool bath house and construction of a new bath house on the same site. Demolition of existing bath house building Removal and disposal of all demolition materials associated with the old building Site preparation for the construction of the new building Tie-in to existing utilities at the site. There will be no Site Utility Contractor, this bid includes all utility tie in work for water, sewer and electric. Site is served by well and septic. There are no location drawings for septic tank, tail lines, waste line, etc. Location of all underground utilities will be the responsibility of the contractor Construction of the new bath hou8se building per the designs included from Plageman Architecture, 13 sheets All finish grading and removal of construction debris, materials, etc. Temporary restroom facilities for construction workers Any temporary fencing required to secure the area from the public
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents