Similar Projects
Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

Main Street Pavers Replacement Program
Infrastructure
Bidding
$332,458 est. value
Ames, IA 50010

Marshalltown Paving Project
Infrastructure
Bidding
$260,000 est. value
Marshalltown, IA 50158

Easton Valley High School Parking Lot
Infrastructure
Post-Bid
Preston, IA 52069

PCC Pavement Patching
Infrastructure
Post-Bid
IA

Bowling Street SW Sidewalk Infill
Results
$990,000 est. value
Cedar Rapids, IA 52404

Cottage Grove Avenue South East from Forest Drive to 34th Street
Results
$1,580,000 est. value
Cedar Rapids, IA 52497

Mount Vernon Road South East 14th to 20th
Conception
$5,400,000 est. value
Cedar Rapids, IA 52407

Hawkeye Wildlife Unit North Road and Babcock Access Road Maintenance
Infrastructure
Bidding
$190,000 est. value
Oxford, IA

HMA Resurfacing
Infrastructure
Post-Bid
IA

Valley View Park North Loop Road Extension
Infrastructure
Results
West Des Moines, IA

32nd Street North East from Carlisle Street through Oakland Road Pavement Reconstruction
Conception
$2,000,000 est. value
Cedar Rapids, IA 52402

Pavement Preservation, Nine Eagles State Park
Infrastructure
Bidding
$200,000 est. value
Davis City, IA 50065

2022 Street Improvements
Infrastructure
Post-Bid
Woodbine, IA

Last Updated 04/20/2022 04:21 PM
Project Title

2022 Asphalt Street Repair

Physical Address View project details and contacts
City, State (County) Fort Dodge, IA   (Webster County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of milling of existing pavement (27,260 SY 3-5 Milling) followed by hot mix asphalt paving (8000 TN – 5 Depth), curb and gutter removal and replacement, ADA compliant sidewalk and ramps and other associated improvements. Improvement locations are at several locations throughout Fort Dodge.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents