Similar Projects
980 Crest Valley Drive Stormwater Improvement
Infrastructure
Bidding
Atlanta, GA 30327

Dressler Ditch Improvements
Post-Bid
Rincon, GA 31326

Crossgate Subdivision Drainage Improvements
Post-Bid
Guyton, GA 31312

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

CDBG Engineering Services
Post-Bid
Alma, GA

FY2019 CDBG Storm Drainage Improvements
Results
Perry, GA

Grayland Hills Drive Drainage
Post-Bid
Lawrenceville, GA 30046

North Fork Nancy Creek Stream Restoration Project
Results
Brookhaven, GA 30319

Street and Drainage Improvements to Oak Lane
Post-Bid
Less than $250,000 est. value
Argyle, GA 31623

Pike County CDBG19 - Storm Drainage and Street Improvements, Hill Top Community
Results
Less than $515,000 est. value
Zebulon, GA 30295

Site Pavement and Erosion Repair
Post-Bid
Savannah, GA

Installation of Street and Drainage Improvements to Velie Road
Results
Less than $135,510 est. value
Nahunta, GA 31553

Davis Street and West Walker Street Drainage and Headwall Project
Post-Bid
Thomaston, GA 30286

Irwin County 2020 LMIG Mcneil Drive
Results
Less than $79,977 est. value
GA

Reported 03/16/2022 12:00 AM
Project Title

Sewer Improvements Facilitative Pond Rehabilitation

Physical Address View project details and contacts
City, State (County) Arlington, GA   (Calhoun County)
Category(s) Environmental, Heavy and Highway
Sub-Category(s) Hazardous Waste Disposal, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of removal and disposal of sludge the first cell of a faciltative pond at the Wood Pond Wastewater Treatment Plant in Arlington, Georgia. The cell is approximately 3 acres in size. It also includes providing and installing a floating cover over the second cell of the pond, approximately 1.5 acres in size.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents