Similar Projects
Savannah Harbor - Infrastructure - Phase I
New Construction
Conception
$130,000,000 est. value
Savannah, GA 31421

Poplar Springs Subdivision
New Construction
Design
Powder Springs, GA 30127

Neese Road Single Family Homes
New Construction
Design
Woodstock, GA

George Luther Property Remediation
Bidding
Decatur, GA 30030

Peters Park Site Improvements
Bidding
Tucker, GA 30084

U-Haul
New Construction
Sub-Bidding
College Park, GA 30349

Graham Road Site Development
New Construction
Post-Bid
Fairburn, GA

Tattnall County EMS Building
Post-Bid
Reidsville, GA 30453

USFWS Okefenokee Bar-Site Prep-Drum Chopping
Results
Folkston, GA

Colonel`s Island Development FY18 (Site Development)
Results
Savannah, GA

T3 West Midtown at Atlantic Station
New Construction - 251,787 SF
Construction
$81,000,000 est. value
Atlanta, GA 30318

Dawson Forest Square - Site Only
New Construction, Demolition
Construction
Dawsonville, GA 30534

North Point Mall Sears Redevelopment
New Construction - 24,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA 30022

Site Improvements to Rivers Homes
Bidding
Columbus, GA 31902

Perimeter Marketplace
New Construction - 60,400 SF
Post-Bid
Dunwoody, GA 30338

Last Updated 03/05/2019 12:52 PM
Project Title

Cumming Fairgrounds Pedestrian Bridge - Grading Improvements

Physical Address View project details and contacts
City, State (County) Cumming, GA   (Forsyth County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Furnishing all materials, labor, delivery, tools, equipment and appurtenances necessary for the Grading improvements for the construction of a Pedestrian Bridge to be located at the Cumming Fairgrounds. The project consists of the following major elements: 1. Construction of Storm Drainage. 2. Re-location of existing Sewer pipe. 3. Construction of Drop Inlet's as required. 4. Temporary grassing and mulch as needed. 5. Asphalt installation over graded area. 6. Construction and removal of sediment control.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Planting Preparation, Soil Preparation, Mulching.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents