Similar Projects
Zero Slater Road
New Construction - 137,500 SF
Conception
$10,000,000 CJ est. value
Morrisville, NC

Legacy Oaks Master Plan
New Construction - 52,900 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Knightdale, NC

Walter Tower
New Construction - 315,000 SF
Design
Raleigh, NC 27609

Hillsborough Pointe
New Construction, Infrastructure
Design
$8,000,000 est. value
Raleigh, NC 27607

BJ's Wholesale Club
Renovation, Demolition - 45,440 SF
Bidding
$1,900,000 est. value
Cary, NC 27511

Liv Cary Apartments
New Construction - 418,962 SF
Sub-Bidding
$62,000,000 est. value
Cary, NC 27518

New DHHS Campus - Phase 1 Package B Sitework
New Construction - 440,000 SF
Sub-Bidding
$59,792,000 est. value
Raleigh, NC

Tower V
New Construction - 322,232 SF
Post-Bid
$10,000,000 CJ est. value
Raleigh, NC 27609

Glenlake III - Site Only Package
New Construction - 211,862 SF
Post-Bid
$10,000,000 CJ est. value
Raleigh, NC

River Oaks Office Renovation
Renovation
Results
Raleigh, NC 27610

Morrisville Town Center Core - Phase I
New Construction - 277,300 SF
Results
$13,000,000 to $44,400,000 est. value
Morrisville, NC

Davis Drive Apartments
New Construction - 107,950 SF
Construction
$15,000,000 est. value
Morrisville, NC

Glenwood II - Block 83
New Construction - 267,333 SF
Construction
$108,000,000 est. value
Raleigh, NC

Apple Campus and Engineering Hub
New Construction - 1,000,000 SF
Pending Verification
$1,000,000,000 est. value
Raleigh, NC

Rose Park Manor
New Construction
Pending Verification
Cary, NC 27511

Reported 06/21/2022 10:22 AM
Project Title

Navaho Drive Mixed Use Development

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27609   (Wake County)
Category(s) Commercial, Residential
Sub-Category(s) Multi-Family Homes, Office, Retail
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and new construction of a mixed-use development in Raleigh, North Carolina. Conceptual plans call for the construction of a three-story above grade multi-residential development; three-story above grade retail development; and three-story above grade office development. The project is located on 32.48 acres at 901, 931, 1001, 1032, 1100 and 1110 Navaho Drive. Scope details have not been released. As of June 17, 2022, the project is in planning stage and seeking rezoning approval from the Raleigh City Council. A meeting was held June 7, 2022, but the results are not yet available. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Retail, 3 Stories Above Grade, New Construction, Office, 3 Stories Above Grade, New Construction, Multi-Family Homes, 3 Stories Above Grade, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents