Similar Projects
New Ashburn Recreation Center
New Construction - 100,000 SF
Design
Ashburn, VA

Shops At County Center - Planet Fitness
Renovation - 14,750 SF
Design
Manassas, VA 20112

Renovation and Expansion of Mount Vernon REcenter
Renovation, Addition - 95,700 SF
Post-Bid
$25,000,000 to $30,000,000 est. value
Alexandria, VA

Episcopal High School Shelter Pavilion
New Construction - 300 SF
Post-Bid
Alexandria, VA 22302

Pod Renovations at James Hurst Elementary School
Results
Portsmouth, VA

George Mason Elementary School
Results
Less than $58,114,000 est. value
Richmond, VA

Lake Ridge Elementary School Additions
- 21,028 SF
Construction
Woodbridge, VA 22192

Old Bridge Elementary School Renewal & Activity Room Addition
Renovation, Addition - 28,875 SF
Construction
$1,866,000 to $3,600,000 est. value
Woodbridge, VA

Kitchen, Servery, and Cafeteria Flooring Renovations and Reconfiguration at John Adams Elementary School
Renovation
Post-Bid
Alexandria, VA

Construction New Matoaca Elementary School
New Construction - 92,802 SF
Results
$30,700,000 est. value
VA 23803

Marshall Elementary School Renovation and Addition
Renovation, Addition
Construction
$7,497,000 est. value
Manassas, VA

Construction Manager at Risk for Hardy Elementary School
New Construction - 106,000 SF
Post-Bid
Smithfield, VA

General Contractors for On-Demand Construction Services for Spotsylvania County Public Schools
Term Contract
Results
$400,000 to $5,000,000 est. value
Fredericksburg, VA 22407

Early Childhood Center (ECC) General Contractor
Construction
Alexandria, VA 22311

Ferry Farm Elementary School Renovations and Addition
Renovation
Results
$9,823,142 est. value
Stafford, VA 22405

Last Updated 06/04/2020 10:09 AM
Project Title

Fredericksburg Christian Elementary School

Physical Address View project details and contacts
City, State (County) Fredericksburg, VA 22408   (Spotsylvania County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Elementary School
Contracting Method
Project Status Construction Commenced July 2019, Construction Completion Expected June 2020
Bids Due View project details and contacts
Estimated Value $3,640,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New elementary school with classroom space, office space, elementary administration, a nurse, essential library space, and a common area for meetings and chapels. Includes an outdoor facility and indoor gymnasium.

Details

2 Stories Above Grade, New Construction, Athletic Facility, New Construction, Elementary School, 48,400 SF New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents