Similar Projects
Existing Russell Hall Demolition
Demolition, Infrastructure
Bidding
$500,000 CJ est. value
Santa Ana, CA 92706

Accessible Pedestrian Signals Installation Project
Infrastructure
Bidding
$50,000 CJ est. value
Laguna Niguel, CA 92677

Measure E Series 3 - Expansion Projects at Greentree ES & Santiago Hills ES
Addition, Demolition, Infrastructure
Sub-Bidding
$40,000,000 CJ est. value
East Irvine, CA 92650

Seal Coat and Striping at Irvine Construction Circle Bus Base
Infrastructure
Sub-Bidding
$275,000 CJ est. value
Irvine, CA 92606

Tract 37509 Heirloom Street Improvements Temecula Center Dr Date Street and Ynez Road
Alteration
Post-Bid
Irvine, CA

Annual Concrete Replacement at Various Locations
Alteration
Post-Bid
$640,000 est. value
Orange, CA 92866

Central Library Fountain Restoration Project
Renovation, Infrastructure
Results
Huntington Beach, CA 92648

LH on the Hill Letter Display
Alteration
Results
Laguna Hills, CA

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Concrete Crack and Spall Repair at ACC Car Park 2
Alteration
Results
Anaheim, CA

On-Call Concrete Sidewalk Surface Grinding
Term Contract
Post-Bid
Irvine, CA

Local Street Sidewalk Improvements
Term Contract
Results
$298,000 est. value
Santa Ana, CA

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

RFQ Contractor - Prima Zone 4 Phase a Mass Excavation and Linear
Infrastructure
Results
$95,194,095 CJ est. value
Tustin, CA 92780

Annual Local Paving Program
Term Contract
Post-Bid
Seal Beach, CA

Last Updated 03/31/2023 04:33 PM
Project Title

Construction of Community Center and Sports Complex Site Improvements

Physical Address View project details and contacts
City, State (County) Laguna Hills, CA 92653   (Orange County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $315,260 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work is comprised of public works construction including removal and replacement of existing fixtures, demolition, construction, and other miscellaneous improvements as shown in the plans and specifications and as required to complete the work.The City reserves the right after opening bids to reject any or all bids, to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder on the Bid Schedule, and reject all other bids, as it may best serve the interest of the City. Within three (3) days of bid opening contractor must submit a revised bid bond with numerical dollar values, both in words and with digits of bid amount. Within ten (10) working days after the date of the Notice of Apparent Low Bidder, the successful bidder will be required to submit required Contract Agreement, Bonds (Faithful Performance and Material and Labor) and Insurance. The Contractor shall possess a valid Class A Contractor's License, or a combination of Class C Contractor's Licenses as necessary to perform the work, at the time of submitting bids, in accordance with provisions of Chapter 9, Division III of the California Business and Professions Code.The wage rates applicable to this Project are the State of California Department of Industrial Relations prevailing rates of per diem wages. In accordance with the provisions of Sections 1773.2 of the California Labor Code, copies of the general prevailing rate of per diem wages as determined by the State Director of Industrial Relations are available at City Hall, which shall be made available to any interested party upon request, or on the Internet at the State Department of Industrial Relations website (www.dir.ca.gov) under Statistics and Research. It shall be mandatory upon the Contractor to whom the contract is awarded and upon any subcontractor to pay not less than said specified rates to all workers employed by them in the execution of the contract. A copy of said rates shall be posted at each job site during the course of construction. The Contractor and all subcontractors shall comply with all provisions of the California Labor Code relating to prevailing wage rates, including Sections 1770-1781 This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The Department of Industrial Relations shall monitor and enforce compliance with applicable prevailing wage requirements for the contract. The reporting requirements may be found at portal The Contractor is responsible for complying with all requirements of the Department of Industrial Relations, including filing electronic payroll reports. It is the contractor's responsibility to ensure they are on the City's Plan Holder's List and they obtain any addendums or clarifications that are issued by the City on the City's website prior to submitting a bid. For any questions regarding acquisition of Contract Documents, contact Julie Comella at jcomella@lagunahillsca.gov. A contractor or subcontractor will not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. The Contractor may elect to receive 100 percent of payments due under the Contract Documents from time to time, without retention of any portion of the payments by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. If the Contractor chooses not to exercise its rights under Public Contract Code Section 22300, the full five percent (5%) retention will be deducted from all payments. The final retention will be authorized for payment thirty-five (35) days after the date of recordation of the Notice of Completion, if no stop notices have been filed. The City may withhold from release of the final retention amounts authorized under Public Contracts Code Section 7107 and/or 125% of amounts identified in any Stop Notices received by the City. Please note on our project page: All questions shall be submitted in writing to jcomella@lagunahillsca.gov no later than January 23, 2023, by 5:00 p.m.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents