Similar Projects
Miami Harbor Maintenance Dredging, 50-Foot Project Maimi-Dade County, Florida
Design
$5,000,000 to $10,000,000 est. value
Miami, FL

Maintenance Dredging, 12 and 11-Foot Project, Ft Myers Beach Harbor, Lee County, FL
Post-Bid
$1,000,000 to $5,000,000 est. value
FL

Maintenance Dredging 10 and 12 Foot Project Naples To Big Marco Pass, Collier County, Florida
Post-Bid
$1,000,000 to $5,000,000 est. value
Naples, FL

Municipal Dredging Services
Term Contract
Results
Lighthouse Point, FL 33064

Milford Point Entrance Channel Maintenance Dredging Project
Results
$192,000 est. value
Melbourne, FL 32940

Dredge Material Manage Area 0-23 (DMMA 023)
Post-Bid
$1,000,000 to $5,000,000 est. value
FL

Fort Pierce Inlet Sediment Impoundment Basin - Phase 1
Results
Fort Pierce, FL 34982

Big Fishweir Creek, Aquatic Ecosystem Restoration, Cap Section 206, Duval County, Florida
Post-Bid
$3,000,000 to $7,000,000 est. value
FL

Shingle Creek Shoal Removal
Results
Kissimmee, FL 34741

Maintenance Dredging, U.S. Naval Station Mayport, 50-Foot Project, Jacksonville Harbor, 47-Foot Project, and Construction Dredging, Jacksonville Harbor Outer Channel Extension, 50-Foot Project, Duval County, Florida
Post-Bid
$10,000,000 to $25,000,000 est. value
Jacksonville, FL 32232

Hillsboro Beach Renourishment Project
Results
Hillsboro Beach, FL 33062

Fernandina Harbor, Maintenance Dredging, 35 and 36-Foot Project, Nassau County, Florida
Post-Bid
$15,000,000 to $25,000,000 est. value
Jacksonville, FL

Sykes Creek Phase 1 Muck Removal Project
Results
$5,156,929 est. value
Viera, FL 32940

Naval Submarine Base Kings Bay -- Entrance Channel, Maintenance Dredging - Cut-1N Through Range-E, 49, 45, And 44-Foot Project, Camden County, Georgia & Nassau County, Florida
Post-Bid
$15,000,000 to $25,000,000 est. value
Kings Bay, GA

Jacksonville Harbor, 47-Foot Deepening Project, Contract C, Duval County, Florida
Results
$200,000,000 to $300,000,000 est. value
Jacksonville, FL 32207

Last Updated 08/21/2020 07:15 AM
Project Title

Bathtub Beach/Sailfish Point Beach Nourishment

Physical Address View project details and contacts
City, State (County) Stuart, FL 34996   (Martin County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Dredge up to 220,000 cubic yards (cy) of sediment from flood shoal Borrow Area ā€œCā€, the Sailfish Point Marina Channel, and the Impoundment Basin, and place the sediment as beach and dune fill along approximately 3,500 feet of Atlantic Ocean shoreline along Bathtub Reef Beach Park and Sailfish Point in Martin County, Florida; perform Impoundment Basin grading from 6,500 cy to 8,000 cy of material, perform all turbidity and vibration monitoring, till the beach after fill placement; complete construction and remove all equipment from the beach by April 30, 2021; in accordance with the Contract Documents. Beach fill construction must be completed, and all equipment removed from the beach by 11:59 pm on April 30, 2021. Beach fill placement may commence on or after January 4, 2021.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents