Similar Projects
Upper Mormon Slough Critical Erosion Repair
Infrastructure
Bidding
$5,387,900 to $6,136,214 est. value
Escalon, CA 95320

PW Pedestrian Safety Improvements
Infrastructure
Bidding
$900,000 est. value
San Francisco, CA 94158

Compost Leachate Pond Improvements
Renovation
Post-Bid
$1,900,000 est. value
Auburn, CA 95603

Levee Maintenance Project
Infrastructure
Post-Bid
Stockton, CA 95214

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Bidding
$16,200,000 est. value
CA

Alameda De Las Pulgas Landslide Repair
Infrastructure
Post-Bid
$340,000 to $350,000 est. value
San Carlos, CA 94070

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

Replace Drainage Pumps
Infrastructure
Bidding
$6,400,000 est. value

Paving Of Residential And Major Streets Rehabilitation Project
Infrastructure
Post-Bid
$1,500,000 est. value
Baldwin Park, CA 91797

Outfall Channel and Instrumentation Improvements
Infrastructure
Results
$4,180,435 est. value
San Jose, CA 95134

Construct Soldier Pile Wall
Infrastructure
Bidding
$1,750,000 est. value
CA

Repair Failing Slope
Infrastructure
Post-Bid
$275,400 est. value
CA

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Reported 09/03/2021 12:00 AM
Project Title

Citywide Flood Protection Maintenance

Physical Address View project details and contacts
City, State (County) Paso Robles, CA   (San Luis Obispo County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work is generally described as vegetation management at each of the drainages and basins including the thinning of brushy vegetation using hand tools; pruning of willows to remove low branches that may block culverts; removal of dead and downed trees from drainage and basin beds; hand removal and possibly herbicide application to remove invasive nonnative vegetation. Removal of accumulated sediment from around culvert inlets and outlets selected drainage locations. Sediment will be removed using hand tools and if needed, a backhoe operated from the top of the bank.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents