Similar Projects
Renovations to Well 2
Post-Bid
Irondale, AL 35210

Hot Water Pump Repair
Post-Bid
Montgomery, AL 36109

N--Replace Pump/Engine on Upland at Eufaula
Results
$90,000 to $110,000 est. value

N--Replace Pump/Engine on Upland at Eufaula
Results
$90,000 to $110,000 est. value

Contract 1 - Test Well and Gravel Filter Finish Production Well (Well No. 6 - Red Springs Well)
Post-Bid
Gilbertown, AL

Waste Water Treatment Six Inch Pump
Results
Less than $38,955 est. value
Alexander City, AL 35011

Lott Road Well and Snow Road Well Replacement
Post-Bid
Citronelle, AL 36522

New Drinking Water Well, Talladega National Forest
Results
$25,000 to $100,000 est. value
Heflin, AL 36264

New Water Supply Well on Pea Ridge Road in Association with Provalus
Post-Bid
Less than $1,200,000 est. value
Brewton, AL 36426

Chilled Water Pumps/Valves Phase 3
Results
Less than $92,955 est. value
Huntsville, AL 35801

Water Supply Improvements (Contract B)
Post-Bid
Irvington, AL 36544

Screw Pump Replacement Phase 1
Results
Loxley, AL 36551

Diagnose/Repair- Molnar/Houston/Upland
Post-Bid
Eufaula, AL 36027

Submersible Wastewater Pumps and Dry Pit Submersible Wastewater Pumps
Term Contract
Results
Huntsville, AL 35801

Sewer Lift Station Motor/Valve Repairs - O`Rourke Elementary School
Post-Bid
Mobile, AL 36695

Reported 01/18/2020 12:00 AM
Project Title

J--Chiller Plant Pump Rebuild

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36109   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will provide all transportation, labor, parts and tools needed to complete requirement. Field technician will pull, rebuild, and reinstall pump and motor. Align motor shaft, wire motor, test amps, and check operation of pump. Pump info: Paco/Peerless 10-20953-13001-2682 Motor info: Lincoln 7.5hp, 208-230/460V, 1725RPM

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents