Similar Projects
Lemont Furnace Area II Road Reconstruction (Storm Sewers)
Infrastructure
Bidding
Uniontown, PA

MS4 Grant Storm Water BMP Improvements
Infrastructure
Bidding
Newtown Square, PA

2021-2026 NPDES Municipal Separate Storm Sewer Systems
Term Contract
Post-Bid
Fairless Hills, PA 19030

14th Street C.S.O. Regulator Modifications
Post-Bid
Arnold, PA 15068

Dunn Avenue Storm Sewer Repairs
Results
Washington, PA 15301

Storm Drain Relocation at the High School
Results
Hummelstown, PA 17036

Ridgeview/Lakeview Drive Stormwater Retrofit
Renovation - 38,100 SF
Construction
Lake Ariel, PA 18436

2022 Stormwater Improvements - Pond Retrofits
Infrastructure
Bidding
Baldwin, PA

Mayfield Dike, Toe Drain Replacement in Archbald, PA
Post-Bid
$250,000 to $500,000 est. value
Archbald, PA

2020 Stormwater Improvements
Results
$295,000 est. value
Belle Vernon, PA 15012

Combined Sewer System Modifications Project No. 2
Infrastructure
Bidding
$556,000 to $720,000 est. value
Newport, PA

Walnut Street Stormwater Improvement Project
Post-Bid
Millersburg, PA 17061

Welcana Drive Stormwater Management Project
Results
Fairview, PA 16415

South Wayne Municipal Parking Lot Flood Reduction Project
Infrastructure
Bidding
Wayne, PA

Ferndale Stormwater Separation Project
Post-Bid
Shamokin, Trevorton, PA 17881

Reported 02/25/2022 12:00 AM
Project Title

I and I Source Reduction Improvements - Year 3

Physical Address View project details and contacts
City, State (County) PA   (Lehigh County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Base Bid scope of work for this project includes rehabilitation of existing sewer pipelines, including 4,496 LF of 8” heavy cleaning, 191 LF of 10” heavy cleaning, 293 LF of 18” heaving cleaning, 220 LF of 20” heavy cleaning, 2,019 joints of 8” joint testing, 18 joints of 20” joint testing, 2,019 joints of 8” joint grout sealing, 18 joints of 20” joint grout sealing, 150 LF of 8” CIPP sectional liner, 30 LF of 18” CIPP sectional liner, 5,300 LF of 8” CIPP full, 293 LF of 18” CIPP full, and 1,508 LF of 20” CIPP full. All CIPP sectional liners will be a minimum of 15 LF. The project includes by-passing flows, as necessary, to accomplish the work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents