Similar Projects
Wauzeka - Soldiers Grove Const / Mill and O'lay / Rsrf
Alteration
Conception
$4,000,000 est. value
Viola, WI 54664

2022 Reconditioning Project
Infrastructure
Bidding
$500,000 est. value
Muscoda, WI 53573

Road Reconstruction
Post-Bid
WI 53581

Reconditioning Johns Hill Drive - Sth 193
Post-Bid
Muscoda, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

City Of Richland Center And City Utilities 2021 Schmitz And Jarvis Street Improvements
Renovation
Results
Richland Center, WI

Pine River Recreation Trail Resurfacing Project
Infrastructure
Post-Bid
Richland Center, WI 53581

Gravel and Sealcoat
Results
Richland Center, WI 53581

Seal Coating and Pre-Coating
Infrastructure
Post-Bid
$300,000 est. value
Richland Center, WI

Avoca - Richland Center, STH 133 - West County Line; Muscoda - Lone Rock, STH 80 - STH 130
Results
Avoca, Lone Rock, Muscoda, Richland Center, WI

Seal Coat
Infrastructure
Post-Bid
$60,000 est. value
WI

Town Hall Drive Reconditioning
Results
WI

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Boscobel - Gotham, CTH W to STH 80
Infrastructure
Results
$75,000 est. value
WI

Last Updated 07/13/2022 03:35 PM
Project Title

STH 80 - USH 14 R / W Oper

Physical Address View project details and contacts
City, State (County) Muscoda, WI   (Richland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sth 80 - Ush 14 From Sth 80 Easterly to Ush 14 R / W Oper State 3r Estimate Anticipated Funding $100,000 - $249,999 As of July 12, 2022, the project is in Final Planning status. Anticipated letting date is July 25, 2022. WisDOT - STH 80 - USH 14 R / W Oper *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents