Similar Projects
Utility Analysis Zone 108
New Construction, Infrastructure
Bidding
$540,038 est. value
Pompano Beach, FL 33060

Utility Analysis Zone 108
New Construction, Infrastructure
Bidding
$540,038 est. value
Pompano Beach, FL 33060

Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Excavated Point Repairs
Post-Bid
Hollywood, FL 33022

Infiltration and Inflow Removal Phase 2A Lateral Repairs
Post-Bid
Hallandale, FL 33009

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

New Raw Water Supply Line (Between Water Treatment Plant and Eastern Wellfield)
Infrastructure
Bidding
$3,000,000 est. value
Hollywood, FL 33024

Provide an On-Site Calibration and Verification of 26 Abb Flow Meters
Term Contract
Post-Bid
Less than $10,995 est. value
Hollywood, FL

GTL Dewatering Building Drain/Vent Pipe Replacement
Results
Fort Lauderdale, FL 33316

Pines Village Water Main Improvements Phase II and Septic Tank Conversion
Infrastructure
Bidding
$13,778,000 est. value
Pembroke Pines, FL

Lyons Park Stormwater and Wastewater Improvements
Post-Bid
Pompano Beach, FL

12 Inch Water Main Installation Foster Road
Results
Less than $1,496,057 est. value
Hallandale, FL 33009

2018 Water Main Improvements - Phase 1A
Infrastructure
Bidding
Margate, FL

Sanitary Sewer Lateral Connection and Lateral Pipe Product
Post-Bid
Plantation, FL

Raw Water Well #9 Pipeline
Results
Hallandale, FL 33009

Last Updated 01/21/2022 05:36 PM
Project Title

Sewer Laterals Pipeline/Structural Lining

Physical Address View project details and contacts
City, State (County) Miramar, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish all labor, materials, tools, and specialized equipment machinery, to perform Structural Lining using CIPP Technology to our Sewer Lateral Pipelines. In Basins 3,4,5 and 6 The City has a lot of 6 inches Clay Sewer Lateral pipes which are severely deteriorated and needs to be Cured-in – place pipe (CIPP) lining which would avoid emergency dig-up in the residences’ backyards. Trenchless Sewer Rehabilitation remains a cost-effective way to address structural pipe defects, prevents root intrusion, and reduce infiltration. Sewer Laterals in the residences’ backyard is between 3 to 5 feet. The distance between each manhole varies from 300 to 400 feet.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents