Similar Projects
Wexford Pond Flood Mitigation
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Madison, WI 53715

Monona Terrace Exterior Caulking Replacement
Alteration
Post-Bid
Madison, WI 53703

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Vestibule Replacement
Alteration
Results
Appleton, WI

Exterior Entrance Repair - GPC
Alteration
Results
$1,625,000 est. value
Whitewater, WI 53190

Outdoor Patio
Alteration
Post-Bid
Wyocena, WI 53969

Tuckpoint Brick
Alteration
Results
Milwaukee, WI 53202

Government Center - Footings and Foundation Bid Package 1
Infrastructure, Alteration
Post-Bid
Wautoma, WI 54982

Building Envelope Improvements
Alteration
Results
Clear Lake, WI 54005

Exterior Building Repairs
Alteration
Post-Bid
Milwaukee, WI 53216

Planter and Retaining Wall Repair City-County Building
Alteration
Results
Madison, WI 53703

Prefabricated Balconies and Decorative Railings Installation for Building 3.1 (Westlawn Renaissance V) at Westlawn Gardens Phase 2
Alteration
Post-Bid
Milwaukee, WI

Engineering Operations Facility - Canopy Replacement/Expansion
Alteration
Results
Madison, WI

Courthouse Exterior Envelope Repairs
Alteration
Post-Bid
Wausau, WI 54403

Oshkosh Public Museum - Hardscape and Garden Wall Rehabilitation
Alteration
Results
$168,820 est. value
Oshkosh, WI 54903

Last Updated 05/08/2023 07:31 PM
Project Title

Construct New South Ramp Hangar with Crew Quarters

Physical Address View project details and contacts
City, State (County) Eau Claire, WI 54703   (Eau Claire County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,998,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Bid proposals will be opened only from those firms that have established their qualifications for the work being bid upon. If a prospective bidder has previously submitted hold a current and valid (not expired or revoked), proper statement and received prior approval from the department, a re-submittal for this project is not required. This contract is federally funded with an established DBE goal, dollar values will not be shown until after the 24- hour supplemental information timeline has expired for DBE documentation submission and bid responsiveness has been determined by the Department. Bids determined to be non-responsive will not have results posted. Construct New South Ramp Hangar with crew quarters and associated civil site work. Estimate of major quantities: 98' X 82' Hangar with crew quarters 1 LS HMA Pavement Non-Wear Course 190 TON HMA Pavement Wear Course 190 TON 4" Concrete Sidewalk 335 SF 6" Concrete Pavement 455 SF DBE Goal: 2.5% Contract Completion Time: 300 Calendar Days Proposals: Proposal forms are included with the plans and specifications, and are subject to the provisions of Wis. Stat. 66.0901(7). Required fields are established within the template. Automatic checking of the bid proposal will identify if any required fields are missing and alert the bidder to complete the missing information prior to final submission. Submission of an incomplete bid will result in the bid not being opened, and/or rejected as non-responsive. Project No. AIP 3-55-0019-57 / BOA EAU1018 Plan holder registration required: Plans and specifications are available to anyone after completing a simple registration. There is NO cost to obtain a registration. Registration is required to be recorded as a plan holder. Registered plan holders will be notified of important project information such as issuance of addendums or other critical information. Only the prime or general contractor selecting to submit a bid is required to obtain additional Digital ID credentials Cost to bid: There are two options for bidders to submit bids: A cost of $35 per project, or a monthly subscription wherein the bidder is able to submit bids for all projects system for $50 per month. Subscriptions can be turned on and off at any time by the registered user. Only the prime or general contractor submitting a bid are responsible for payment. Proposal guaranty: A bid security in the amount of 5% of the total amount of the bid is required for the contract. Each proposal must be accompanied by a bid bond, certificate of annual bid bond, a certified check, bank's draft, bank's check, or postal money order made payable to the Wisconsin Department of Transportation Secretary for 5% of the total amount bid. The electronic template will allow the following options for meeting the proposal guaranty. E-Verify bid bond (Surety2000 & SurePath), uploading a copy of the bid bond or certificate of annual bid bond, certified check, bank draft, or money order. Any bid security, other than a E-verified bond or certificate of annual bid bond is provided, the department will require that the apparent two lowest bidders to mail or hand-deliver the original bond, certified check, bank draft, or money order to the Bureau of Aeronautics by close of business two business days following the close of bids and must be received by the Bureau of Aeronautics no later than 5 days from the posting of the bid results. Qualification of bidders: A paper hard copy prequalification is required to be submitted PRIOR to the bid opening. The proper prequalification form must be sent to the DOT to establish prequalification and remain valid prior to the deadline for prequalification indicated below. Prequalifications submitted after the deadline will be processed but a bid from that firm will not be opened for any project where the deadline has been exceeded. The following prequalification is required for this contract: The Bureau of Project Development "Prequalification Statement" (AKA: "Highways") will apply. TWO prequalification methods are acceptable for this project. EITHER Bureau of Aeronautics "Statement of Bidder's Qualifications and Experience" (AKA: "Short form") will apply. OR the Bureau of Project Development "Prequalification Statement" (AKA: "Highways"). If your firm does not already hold a valid WisDOT highways prequalification and you do not expect to bid WisDOT highways projects in the future, please complete the simplified Bureau of Aeronautics "short form Any prospective bidder who has not previously established their qualifications must file a pre-qualification statement on the proper forms and be received by the department no later than 12:00 noon, local time, Friday, April 7, 2023. Only prime or general contractors submitting the bid need to be prequalified; subcontractors do not need to be prequalified. The qualification statement is a sworn statement and consist of information relating to financial ability, equipment, and experience in the work prescribed in this proposal. The statement shall be in writing on the proper standard form furnished by the department. The department will evaluate the statement and determine acceptability prior to bid acceptance. Failure to establish prequalification as stipulated will result in the bid not being opened and/or rejected. Federal Requirements: This project is federally funded and federal provisions and requirements apply. Federal provisions made part of, but not limited to this contract include: Buy American Preference, Federal Tax Certification, Foreign Trade Restriction, Davis Bacon, Affirmative Action, Governmentwide Debarment and Suspension, Governmentwide Requirements for Drug-free Workplace. Hours of labor and minimum wage rates: Pursuant to regulations provided by applicable federal and/or state laws, the hours of labor and minimum wage rates are set forth in the proposal. Affirmative action: The department hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. Affidavit of non-collusion: A required affidavit of non-collusion will be incorporated as part of the proposal for each prospective bidder. Failure to complete and sign the sworn statement makes the bid non-responsive and ineligible for award consideration. By completing the electronic signature and submitting the proposal, each bidder by or on behalf of the person, firm, association, or corporation submitting the bid, certifies that such person, firm, association, or corporation has not, either directly or indirectly, entered into agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid. This sworn statement shall be executed and sworn to by the bidder before a person who is authorized by the laws of the state to administer oaths. For further information, contact Bob Sworski at, bsworski@cbssquaredinc.com.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents