Similar Projects
Flooring Removal and Installation Services
Term Contract
Sub-Bidding
Dallas, GA 30132

Centerville Library Carpet Replacement Project
Renovation
Sub-Bidding
$90,000 CJ est. value
Snellville, GA 30039

Painting and Flooring Services
Alteration
Post-Bid
Atlanta, Augusta, Cadwell, Claxton, College Park, Columbus, Conyers, Cordele, Dalton, Dawson, Decatur, Eastman, Gainesville, Hampton, Macon, Marietta, Rome, Savannah, Thomasville, Washington, Waycross, GA 31820

Painting and Flooring Services
Alteration
Post-Bid
Atlanta, Augusta, Cadwell, Claxton, College Park, Columbus, Conyers, Cordele, Dalton, Dawson, Decatur, Eastman, Gainesville, Hampton, Macon, Marietta, Rome, Savannah, Thomasville, Washington, Waycross, GA 31820

Carpet Replacement for Moody AFB Fire Station - Building 621
Results
Moody Air Force Base, GA

Fluid Applied Resilient Flooring Replacement Services
Alteration
Results
Winder, GA 30680

Lost Mountain Middle School Flooring Replacement
Renovation
Construction
$1,290,810 CJ est. value
Kennesaw, GA 30152

Garrison Mill Elementary School Flooring Replacement
Renovation
Construction
$553,600 CJ est. value
Marietta, GA 30062

Flooring Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Blackshear, GA 31516

BES Flooring Replacement
Alteration
Post-Bid
Blackshear, GA 31516

Polk School District Gym Floors
Alteration
Results
GA

Senior Center LVT Flooring
Renovation
Sub-Bidding
$300,000 CJ est. value
Cleveland, GA 30528

Fire Station 10 Flooring
Alteration
Post-Bid
Suwanee, GA 30024

Floor Stripping and Waxing
Alteration
Results
Cedartown, GA

23 MUNS Bldg 714 Carpet Install
Renovation
Sub-Bidding
$200,000 CJ est. value
Moody AFB, GA 31699

Last Updated 04/28/2023 04:33 AM
Project Title

Gym Floor Replacement

Physical Address View project details and contacts
City, State (County) Lagrange, GA 30241   (Troup County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $229,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

No bid may be withdrawn for a period of thirty (30) days after bids are opened. Bid bond in the amount of five percent of the base bid is required and must be submitted with the bid. A bid bond is the only acceptable form of bid security. No personal checks, cashiers checks, certified checks or cash will be accepted in lieu of the bid bond. Performance and payment bonds in the amount of one-hundred percent (100%) of the contract sum will be required prior to commencement of construction. All bonds shall be written by a surety licensed to conduct business in Georgia, listed on the Federal Register and acceptable to the Owner. Bidder shall attach a Contractor Affidavit and Agreement demonstrating compliance with O.C.G.A. 13-10-91, Georgia Security and Immigration Compliance Act. Bidder shall also comply with provisions of O.C.G.A. 5036-1, Verification of Lawful Presence Within United States through the use of the Systematic Alien Verification for Entitlements (SAVE) program and shall provide verification of compliance with executed affidavits which are available on the Georgia audits and Accounts website Owner reserves the right to waive technicalities and irregularities and to reject any or all bids. Removal and replacement of the hardwood maple athletic flooring in the Aux gymnasium. The existing floor is a direct glued maple parquet floor with no subfloor measuring 11,715 total square feet. (Contractor is responsible to verify square feet) The floor is glued directly to the concrete. Approximately 2800 square feet at the north end of the gymnasium has rotted due to chronic moisture. The glue has failed throughout this area and the floor is discolored in areas that are compromised. There is also evidence of other slightly discolored along the expansion joints in the concrete substrate. The discoloration that appears on the parquet is an indicator of long term chronic moisture damage. Because the existing floor is wood glued directly to concrete, the floor is extremely susceptible to changes in moisture in the concrete. This change can be attributed to failed moisture prevention under the slab. Based on the above information, we believe the moisture is coming up from the slab rather than an incursion of water into the building from the roof or from the walls. Replace floor with a fixed resilient sleeper system that will incorporate a 10 mil moisture barrier and provide a forced air solution to inhibit future moisture issues. Once the existing parquet floor has been removed, the concrete slab must be inspected for evidence of moisture source. Contractor must apply an elastomeric filler for any excessive cracks that may be found. Install a new fixed resilient ,wood sleeper and subfloor consisting generally of 12mm resilient pads, 1" engineered plywood sleeper, one layer of 15/32" thick, 4'x 8' CDX rated sheathing and steel anchors installed over 10 mil polyethylene moisture barrier. MFMA approved 25/32" x 2 1/4 ", 2nd & better grade northern hard maple nailed approximately 16" on center. After proper installation, Sand floor smooth using coarse, medium and fine sandpaper, then rotary sanded or "screened" to remove all drum sander marks. Then seal floor with two coats of Bona DTS, in preparation for the painting game lines, lettering, and logos similar to existing, using Bona SuperSport game lines paint. Following the painting, Three coats of Bona SuperSport water based gym floor finish applied to the entire court surface After the finishing of the floor install 4"x 3" black vent cove base at the perimeter of the gymnasium floor. Heavy rubber ADA ramps installed at the two exterior entrances, five interior halls and four single door exits. During this installation process detach, move & reattach the existing bleacher system as well as raise the goals as needed. Provide and install six new flush mounted volleyball plates. Install a flush mounted air flow system under the bleachers on one side of the floor to force ambient air under the new floor system.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents