Similar Projects
RFP - Stormwater Utility Community Based Partnership
Term Contract
Conception
$500,000 CJ est. value
Kansas City, KS 66101

Kanopolis Rip-Rap Overlay
Infrastructure
Design
$150,000 CJ est. value
Marquette, KS 67464

Tallgrass Apartments - Phase 3
New Construction, Infrastructure
Design
$80,000,000 CJ est. value
Gardner, KS 66030

OS 95 Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$316,300 CJ est. value
Lincoln, KS 67455

Nicodemus National Historic Site Install Water Line and Service Connection 36864
Alteration
Bidding
$25,000 est. value
Bogue, KS 67625

Signing
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Lucas, KS 67648

Intelligent Transportation System
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Riley, KS 66531

Planeview Water Main Replacement with Customer Service Line Replacement Planeview Subdivision No.1
Infrastructure
Post-Bid
Wichita, KS

Fairlane Commercial Center Water and Gas Utility Relocation
Infrastructure
Post-Bid
Louisburg, KS

Wyandotte County Water Line - Phase V
Results
$475,000 to $650,000 est. value
Kansas City, KS

2020 Water System Improvements - 340Th Street from Thrasher Road to Tumbleweed Road
Results
KS

Flint Hills Orthopedic Expansion
Addition, Demolition, Renovation, Infrastructure - 5,000 SF
Pending Verification
$1,500,000 CJ est. value
Andover, KS 67002

Archers Landing at Sundance Ridge Third Plat
New Construction, Infrastructure
Pending Verification
$180,000,000 CJ est. value
Overland Park, KS 66204

StorTropolis
New Construction, Infrastructure - 144,441 SF
Design
$20,000,000 CJ est. value
Olathe, KS 66061

Booster Pump Station Improvements
Renovation, Infrastructure
Bidding
$430,000 CJ est. value
Manhattan, KS 66502

Last Updated 07/29/2022 11:08 AM
Project Title

Site2 Standpipe Improvements and Coatings

Physical Address View project details and contacts
City, State (County) Horton, KS 66439   (Brown County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Water and Wastewater Facilities, Water Tower Rehabilitation and Repair, Painting Description: The successful Bidder shall provide all necessary labor, equipment, and materials to perform the following work: A. Remove all existing coatings (interior and exterior) and perform necessary surface preparation for new coatings. B. Prepare surfaces, perform necessary maintenance, and complete 3rd party testing: Holiday testing, dry film testing, steel inspections, and 2 hour temperature/humidity readings prior to application of new coatings. C. Coat entire exterior tank surface in accordance with attached specification section 09900. D. Coat entire interior tank surface in accordance with attached specification section 09900. E. Install a ladder extension from the bottom of the existing ladder to 1.0' above ground level on the tank in accordance with attached specification section 02520. F. Install personal fall arrest system to the existing and new ladder extension beginning at a height of 24 feet from the ground surface and extending to the top of the tank ladder in accordance with attached specification section 02520. G. Furnish and install a 42 inch high guardrail, kick plate, and hinged, self-closing gate along the perimeter of the roof of the tank in accordance with attached specification section 02520. H. Disinfect tank in accordance with KDHE I. Perform necessary site clean-up and demobilize all equipment from site. Site Directions: The Site #2 tank is located approximately 2.5 miles north of the Water Treatment Plant. The address nearest the water storage tank is: 1347 Golden Eagle Rd Horton, KS Work Complete 60 Calendar Days from NTP

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents