Similar Projects
New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

Water Main Relays
Infrastructure
Post-Bid
Milwaukee, WI 53274

Water Main Relays
Infrastructure
Post-Bid
Milwaukee, WI 53225

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Repair/Replace Sidewalks
Infrastructure
Results
Milwaukee, WI

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Oakview Parkway Industrial Building
New Construction, Infrastructure - 130,710 SF
Construction
$90,000,000 CJ est. value
Oak Creek, WI 53154

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

South 13th Street Industrial Building
New Construction, Infrastructure - 191,406 SF
Design
$103,000,000 CJ est. value
Oak Creek, WI 53154

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Performing Arts Pedestrian Pavement Replacement
Infrastructure
Results
Milwaukee, WI 53202

Cape Crossing
New Construction, Infrastructure
Construction
$85,000,000 CJ est. value
Franklin, WI 53132

Multi-Family Oak Creek Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Oak Creek, WI 53154

Last Updated 05/09/2023 09:13 AM
Project Title

Mckinley Marina Parking Lot Reconstruction - Phase 2

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53202   (Milwaukee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,621,032 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Description: Work consists of removing existing asphalt surface and concrete curb and gutter, pulverize existing pavement, regrade, and provide new aggregate base, new concrete curb and gutter, concrete sidewalk and asphalt pavement as indicated in the project Bid documents. Additional new work consists of storm drainage green infrastructure, storm sewer, sanitary sewer, watermain, LED Lighting, boat launch improvements, storage building, fish cleaning structure, fish cleaning station, underground fuel tanks, fuel systems, decorative fencing, and site furnishings Substantial Completion Date: June 24th, 2024 Project funded by local. Bid summary results may be available a few hours following the Bid Due Date time. Contractors shall employ a minimum of 50% of the Contract labor force with employees that reside in Milwaukee County. Documentation must be performed by LCPtracker Labor Compliance software

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents