Similar Projects
Antique Street Light Improvements
Infrastructure
Sub-Bidding
$1,870,000 CJ est. value
Glendora, CA 91741

Ethernet Switches and Installation Services E-rate Year 2023
Renovation
Sub-Bidding
$500,000 CJ est. value
Norwalk, CA 90650

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Post-Bid
Los Angeles, CA 90081

2001 North Garey Avenue Power Upgrade
Infrastructure
Post-Bid
Walnut, CA 91789

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Results
Torrance, CA 90504

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

Traffic Signal, Flashing Beacon and F.O. Communications Maintenance Services
Term Contract
Sub-Bidding
Downey, CA 90241

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

Pacific Coast Highway Signal Synchronization Project
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Malibu, CA 90265

Electric Service Upgrade at Five School Sites
Renovation, Infrastructure
Post-Bid
Whittier, CA 90603

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Construct DPPIA Devices and Modify Lighting Systems
Infrastructure
Sub-Bidding
$6,400,000 CJ est. value
Los Angeles, CA 90012

Led Lighting Retrofit
Alteration
Post-Bid
Los Angeles, CA 90007

Electrical System Repair Services
Alteration
Results
CA

Last Updated 11/29/2022 03:35 PM
Project Title

Faculty Levering Generator Replacement

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 90024   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $320,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited for the following work: Faculty Levering Generator Replacement DESCRIPTION OF WORK: Contractor shall furnish all labor, material, and equipment to replace an existing emergency 80 Kw, 3-phase diesel generator at UCLAs Faculty Levering Apartments, located at 827 Levering Avenue. The work also includes installing an exhaust flue for new generator. The specifications and drawings describe the location, the generator make and model, performance requirements, Fire/Safety requirements and Southern California Air Quality Management District (SCAQMD) permitting requirements for the operating process of the emergency generator. Work shall include all electrical, fire-alarm, mechanical, concrete and structural work required to replace the existing generator including all connections to power, air intake, filtering and exhaust systems and related Fire Life Safety equipment. Contractor shall restore the surrounding walls, ceilings, doors, louvers, facade of the generator room, building and adjacent spaces in which the unit resides. Contractor shall be responsible for proper disposal or recycling of the removed existing generator and all chemical waste including all fuels, coolants and lubricants. Contractor shall coordinate, plan, and furnish crane services as required, for the removal of the existing generator and installation of the new generator, as well as the provision of a temporary generator to provide continuous service during work. At no time shall Contractor permit the building to be without back-up electrical service. Pre Bid Meeting Info : Dial by your location 1 213 338 8477 US (Los Angeles) 1 669 219 2599 US (San Jose) 1 971 247 1195 US (Portland) 1 253 215 8782 US (Tacoma) 1 346 248 7799 US (Houston) 1 602 753 0140 US (Phoenix) 1 720 928 9299 US (Denver) 1 301 715 8592 US (Washington DC) 1 312 626 6799 US (Chicago) 1 470 250 9358 US (Atlanta) 1 646 558 8656 US (New York) 1 651 372 8299 US (Minnesota) 1 786 635 1003 US (Miami) Find your local number: https://ucla.zoom.us/u/adJIVaI7XH The successful Bidder will be required to have the following California current and active contractors license at the time of submission of the Bid: B License (General Building) Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements. Remove the Existing 80 Kw Emergency Generator on Level 2. Remove the Existing Day Tank and the Concrete Pad Under the Day Tank. Remove the Existing Battery Charger Located on the Wall. Install a New 80kw Generator With the Sub Base Fuel Tank in Place of the Existing Generator. Replace or Extend the Existing Pad for the Existing Pad for the New Generator Pre Structural Drawings. Make All Necessary Electrical Connections for the Generator With New Cable and Conduit. A Hose From the Fuel Truck Will Be Directly Connected to the Sub Base Fuel Tank. Install a Fully Functioning Exhaust System Including a Pm Filter, a Silencer, the Existing Vent and a New Vent Up to the Roof. Temporary Power Generator Generator Cables Shall Be Brought Over and Suspended and Properly Attached to the Wall Leading to Room as Power Needs to Provided When Old Unit is Removed and Prior to New Unit Being Installed. No Raceway Needs to Be Provided. Connection Shall Be Provided to Main Fire Alarm Panel at Building Lobby

Details

4 Stories Above Grade, 1,450 SF.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents