Similar Projects
Jadwin Dam Modification
Renovation
Design
$5,000,000 to $10,000,000 est. value
Honesdale, PA 18431

Beach Creek Dam
Post-Bid
Less than $25,000 est. value
State College, PA 16801

Lower Woods Pond - Renovate Dam
Infrastructure
Post-Bid
$2,000,000 to $3,000,000 est. value
Honesdale, PA 18431

Dam Rehabilitation - Construction - Hibernia Dam, Chester, PA
Results
$500,000 to $1,000,000 est. value
PA 19320

Stilling Basin Repair, Foster Joseph Sayers Dam, Beech Creek, PA
Results
$1,000,000 to $5,000,000 est. value
Beech Creek, PA 16822

Lock Control System Modernization, Lock and Dam #5, Allegheny River, Freeport, PA
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Freeport, PA

Stoplog & Bulkhead Fabrication, Delivery, Installation and Testing
Results
Leesport, PA

INDUSTRY DAY EVENT - US Army Corps of Engineers Pittsburgh District, Lower Monongahela Dam Removal
Demolition
Post-Bid
Pittsburgh, PA

Multiple Locations Dam Rehabilitation Project
Results
PA

RFI - Monongahela River, Lock and Dam 3 Decommissioning
Renovation
Post-Bid

Reservoir Sluice Gate Replacement
Results
$50,000 to $100,000 est. value
Ebensburg, PA 15931

Mansfield Levee Repair in Mansfield, Pennsylvania
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Mansfield, PA

General Excavating
Term Contract
Results
Montrose, PA

Replace Outlet Structure - Memorial Lake State Park
Results
$100,000 to $500,000 est. value
PA

Capitol Complex Central Plant Steam Tunnel Repairs - General Construction
Results
$500,000 to $600,000 est. value
Harrisburg, PA 17100

Last Updated 09/17/2021 01:58 PM
Project Title

Modifications to Bellwood Dam

Physical Address View project details and contacts
City, State (County) Altoona, PA   (Blair County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $18,500,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of modifications to Bellwood Dam including clearing and grubbing, water management control and dewatering, engineered fill placement, drainfill and filter drains, new spillway and intake structure, outlet valve vault, crest parapet wall, drilling and grouting, rock anchors, intake tower access bridge, stream channel and streambank stabilization, mechanical piping, basin sediment removal and disposal, reservoir aeration system, constructed wetlands, access roads, site improvements and all required appurtenances.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents