Similar Projects
Ada Site Improvements At Gillette Manor
Infrastructure, Alteration
Bidding
Sayreville, NJ 08871

Improvements to Ernston Road
Infrastructure
Bidding
Sayreville, NJ

Jules Lane Roadway Improvements
Post-Bid
$300,000 to $400,000 est. value
New Brunswick, NJ 08901

Repair to Campus Walkways and Roadways
Post-Bid
Edison, NJ 08818

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Roadway Resurfacing, Milepost 83 to 122 Section 14 and 17 (2020)
Results
$27,785,000 est. value

Culvert Repairs Milepost 112 To 113
Infrastructure
Bidding

2020 Milling and Resurfacing Program
Post-Bid
Woodbridge, NJ 07095

Brotherhood Street Roadway Improvements
Results
Piscataway, NJ 08854

Improvements to Walnut Street and Filbert Street Year 47 CDBG
Infrastructure
Bidding

Georges Road Improvements
Post-Bid
New Brunswick, NJ 08901

Reconstruction of Kroeger Lane Improvements
Results
Piscataway, NJ 08854

2021 Various Roadway Improvements
Infrastructure
Bidding
Metuchen, NJ 08840

Asphalt Paving Services
Post-Bid
North Brunswick Township, NJ 08902

Reconstruction of Riverview Avenue Improvements
Results
Piscataway, NJ 08854

Last Updated 09/29/2021 04:01 PM
Project Title

Easton Avenue, French Street, Albany Street and Proposed Spring Street

Physical Address View project details and contacts
City, State (County) New Brunswick, NJ 08988   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall furnish all labor, materials, equipment, etc. For clearing site roadway, roadway excavation, grading, paving, curb, sidewalk, storm drainage, lighting foundations and conduit, topsoiling and seeding, signing, striping, signal equipment installations, soil erosion control and all associated work required in accordance with the plans and specifications prepared for traffic signal at the intersection of Easton avenue, French street, Albany street and proposed spring street connector and also includes the traffic signals at Easton avenue with Somerset and Hamilton streets.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents