Similar Projects
Union Street Parking Lot Reconstruction - FY23-PWD-74 - City of Rochester
Infrastructure
Conception
$1,100,000 CJ est. value
Rochester, NH 03867

UNH Field House West Lot Parking Lot Site Improvements
Infrastructure
Design
$200,000 CJ est. value
Durham, NH 03824

Culvert, Reinforced Concrete Pipe Class IV and V
Term Contract
Post-Bid

WWTF Lagoon No. 1 Liner Repair
Infrastructure
Post-Bid
$115,000 est. value
Milton, NH 03851

Septic and Floor Drain Line Services
Results

Amanda Howard Park Playground Site Preparation
Infrastructure
Results
Dover, NH 03820

Fownes Mill Condominiums
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Rochester, NH 03867

2A Tactical
New Construction, Infrastructure - 11,080 SF
Pending Verification
$1,500,000 CJ est. value
Barrington, NH 03825

Apple Ridge Rochester Hill Multi-Residential Development Phase 3
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Rochester, NH 03867

High Street (Route 9) Corridor Signal Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Somersworth, NH 03878

CM Services - UNH Utility Distribution Project Main Lines Leaving the CHP
Infrastructure
Results
Durham, NH 03824

Allonsy - Park Recovery Center of Dover
New Construction, Infrastructure - 25,500 SF
Pending Verification
$15,000,000 CJ est. value
Dover, NH 03820

Rocky Hill Road Culvert Replacement
Infrastructure
Results
Somersworth, NH 03878

Shammy's Car Wash
New Construction, Infrastructure - 3,000 SF
Pending Verification
$1,000,000 CJ est. value
Somersworth, NH 03878

Drainage Rehabilitation along the Turnpike System
Infrastructure
Results
$538,562 est. value

Last Updated 08/16/2022 11:14 AM
Project Title

Replace/Repair Portland St. Culvert - FY22-PWD-46 - City of Rochester

Physical Address View project details and contacts
City, State (County) Rochester, NH 03868   (Strafford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2025
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Portland Street bridge structure is a 1931 concrete box culvert carrying Willow Brook. The span is 11'. This structure has been placed by NHDOT on their "Pink List" of bridges, which although not official is the precursor to the official Red List. The bridge supports two lanes and sidewalks and is a historic structure. An FY22 appropriation funded design of the culvert rehabilitation. This FY24 request is for construction of the rehabilitation project. This project is included in the city's 2023-2028 Capital Improvement Plan (CIP) and funding is allotted for FY 2024. As of August 16, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents