Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

TRAIL: Coyote Creek Lighting( Under Interstate 280) - City of San Jose
Infrastructure
Conception
Less than $315,000 est. value
San Jose, CA 95154

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Hemlock Avenue Mixed Use Development
New Construction, Infrastructure - 11,910 SF
Pending Verification
$24,000,000 CJ est. value
San Jose, CA 95128

Measure T - New Fire Station 36 - City of San Jose
New Construction, Infrastructure
Conception
$11,985,000 est. value
San Jose, CA

Main Street Milpitas
New Construction, Infrastructure - 350,257 SF
Design
$16,300,000 CJ est. value
Milpitas, CA 95035

CHP-Gilroy Commercial Vehicle Enforcement Facility (CVEF) Southbound (SB) – Parking Lot Steam Cleaning Services
Term Contract
Post-Bid
Gilroy, CA

Lawrence Expressway Pavement Rehabilitation Project Between US-101 and SR-237
Infrastructure
Results
Santa Clara, CA 95056

Last Updated 09/13/2022 10:11 AM
Project Title

Two (2) Turnouts Project

Physical Address View project details and contacts
City, State (County) Palo Alto, CA 94301   (Santa Clara County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $999,100 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

***As of September 13, 2022. Project not awarded yet. Description of Project: Removal of existing potable water piping and valving in existing vaults and installation of new 10" to 16" piping and pressure reducing valves. Piping work includes saw cutting, excavation, backfill, concrete work, grouting, and paving. Work also removal and replacement of electrical wires, electrical boxes, hazardous lead paint removal, welding work, and traffic control and coordination with City Staff. NTP Date expected 11/29/2022 Project Duration 66 working days after NTP Bid Valid 90 days Liquidated Damages $3,800 Online Q&A Yes Q&A Deadline 07/28/2022 1:00 PM (PDT)

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents