Similar Projects
Building 1318 - New Production Space Utilities
Renovation, Alteration
Post-Bid
$100,000 to $250,000 est. value
Newport, RI 02841

Replace Boilers in Building 10
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$50,000,000 CJ est. value
N Providence, RI 02908

Upgrades to Building 684-CHI DIILS, Naval Station Newport, Newport, RI
Renovation
Results
$5,000,000 to $10,000,000 est. value
Newport, RI

RIARNG Warwick Armory HVAC Upgrades to Building 3
Renovation
Results
Warwick, RI 02886

NAVFAC Classroom Repairs - Building 440 Perry Hall
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Newport, RI 02841

Building 6. Onsite installation of modular office
Renovation
Post-Bid
$250,000 CJ est. value
Newport, RI 02841

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Last Updated 10/03/2022 03:03 PM
Project Title

B1319 R314 Alteration

Physical Address View project details and contacts
City, State (County) Newport, RI 02841   (Newport County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Building 1319 Room 314 Alteration - Acoustic Isolation. Selected demolition, sound control door assembly nterior finishes, and modification to interior power distribution; provision of metal stud partitions, sound rated metal doors and frames, and interior finishes; and incidental related work. Work includes removal of existing doors and selectively demolish finishes; provision of new foam insulation in existing walls, provision of a new acoustical door, provision of new carpet tiles and acoustical ceiling tiles, minor modification to existing ductwork, minor modification of existing electrical utilities, patching of drywall, and painting; and incidental related work. Onsite contractor supervision will require at least one qualified individual serving the roles of superintendent, quality control manager, and site safety and health officer. B1319 R314 Alterations Draw ing Set 22-019A and Specifications dated 30 Apr 2022. FAR 36.204 Disclosure of the magnitude of construction project: - Physical characteristics: Room alteration including spray foam insulation, sound rated metal doors and frames, and ancillary electrical/HVAC. - Estimated price is betw een $100,000 and $250,000 Site Visit: 10:00 AM ET Thursday 15 Sep 2022. Register separately w ith both NUWC Security and NUWC Contracts Departments. Questions accepted up to one w eek prior to quotations due date. Email to joseph.scarpa6.civ@us.navy.mil and alexander.olarte.civ@us.navy.mil. Quotes due: Tuesday 4 Oct 2022 before 2:00 pm ET. Email to joseph.scarpa6.civ@us.navy.mil and alexander.olarte.civ@us.navy.mil. 100% Small Business Set-Aside: 238120 Structural Steel and Precast Concrete Contractors; Size Standard $16,500,000.00. Fill-ins, representations, and technical information required w ith proposal. See Sections B, G, J, K, L and M. Method of Payment: Government Purchase Card. Include processing fee in CLIN 0001 price. Bid Bond not required. Performance Bond required if contract over $150,000. Payment Bond required if using subcontractors. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents