Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

Water Source Heat Pumps; BP#1-23C Ground Source DOAS Units
Alteration
Post-Bid
Kenilworth, IL

HVAC Parts and Supplies
Alteration
Post-Bid
Chicago, IL

Des Plaines HVAC Improvements
Results
Des Plaines, IL

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

Pre-Purchase of A Chiller
Alteration
Post-Bid
Palatine, IL

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

HVAC Service Contract
Alteration
Post-Bid
Oak Park, IL 60304

Replace Split System Condensing Unit at Pace Northwest Division
Results
Arlington Heights, IL

2022 Four Schools (Chiller Pre-Purchase)
Alteration
Post-Bid
Mount Prospect, IL 60056

J041--Repairs need to HVAC System(578)
Term Contract
Results
Hines, IL

2022 Summer Work - Bid Period 002 - Mechanical Equipment
Alteration
Post-Bid
Winnetka, IL

2021 Pool RTU Replacement
Alteration
Results
Streamwood, IL 60107

HVAC Equipment Pre-Purchase
Alteration
Post-Bid
IL

Last Updated 03/22/2023 12:12 PM
Project Title

East Dome RTU Replacement - Building A

Physical Address View project details and contacts
City, State (County) River Grove, IL 60171   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $218,900 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

East Dome Roof Top Unit Replacement - Building A QUESTIONS, PLEASE CONTACT ARCON ASSOCIATES, INC. - Mr. Gaspare Pitrello (630) 495-1900 Ext. 210 or email gppitrello@arconassoc.com] Bids shall be accompanied by a Bid Security as noted in the Advertisement for Bids. Such Bid Security shall be in the form of a certified check or Bid Bond in the amount of 10% of the Proposal. All checks and Bonds shall be made in favor of the Owner. Failure to submit the proper form and amount of Bid Security may result in rejection of the bid. Bid Bonds must be issued by the same company that provides the subsequent Performance and Payment Bonds The Owner reserves the right to reject any or all bids, to waive irregularities, and to accept that bid which is considered to be in the best interests of the Owner. Any such decision shall be considered final. The Owner reserves the right to set aside a bid from a Contractor who, in the Owner's opinion, does not exhibit past experience equal to the size and scope of this project. Start Date: Wednesday, March 27, 2024 Substantial Completion: Wednesday, May 8, 2024 @ 5:00pm Final Completion: Tuesday, May 21, 2024 @ 5:00pm

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents