Similar Projects
Shipyard Services
Post-Bid
Portland, ME

Shipyard Services
Infrastructure
Post-Bid
Portland, ME

Install WPB Shore Tie GMRI Cutter Pier at CG Sector Northern New England (Cumberland County)
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Portland, ME 04101

Fishing Pier Expansion
Results
Bucksport, ME

Main Floats Reconstruction
Results
Bucksport, ME 04416

North and South Abutment Reconstruction
Infrastructure
Post-Bid
Northeast Harbor, ME

Sheet Piling Project
Infrastructure
Results
Castine, ME

Annabessacook Lake Boating Facility
Infrastructure
Results
Winthrop, ME

Fish Pier Improvements
Results
Less than $500,000 est. value
Rockland, ME 04841

Boat Dock Replacement
Results
Oxford, ME 04270

Replacement of Docks 2 and 3 at the Bangor Waterfront
Results
Less than $331,000 est. value
Bangor, ME 04401

City Owned Property - Marina Docks
Infrastructure
Results
Bangor, ME

Sheepscot Lake Boating Facility Renovations
Infrastructure
Results
Less than $135,000 est. value
Palermo, ME

Johnson Bay & Cobscook State Park Boat Ramp Renovations
Results
Less than $100,000 est. value
Lubec, ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Results
$500,000,000 est. value
Kittery, ME

Last Updated 05/06/2022 02:26 PM
Project Title

Restore Outfitting Capacity, Berth 6C

Physical Address View project details and contacts
City, State (County) Kittery, ME 03904   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will repair or upgrade electrical, mechanical and civil utilities and infrastructure at Berth 6. The repairs include electrical, communication, steam, condensate, water, sewer, compressed air and other services. Project will also restore the industrial power service, including a fenced electrical substation yard, and load center as well as equipment pads, and sea level rise mitigation. Numerous penetrations through or below the portal crane rail foundations to route new ductbanks or piping will be required. A raised utility trench/seawall will be installed along the length of the berth with mooring cleats and bollards installed on top. Rock anchors will be required to install the mooring hardware and civil site work/demo of granite blocks will be required to install the raised trench/seawall.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents