Similar Projects
Jefferson Park Firehouse Apartments
Renovation
Conception
$2,400,000 est. value
Chicago, IL 60630

North Side Apartment Tower
New Construction
Conception
Chicago, IL

400 Lake Shore Development
New Construction
Design
$1,000,000,000 est. value
Chicago, IL 60601

725 W Randolph Mixed Use
New Construction
Design
Chicago, IL 60601

Concrete Sidewalk Replacement
Infrastructure
Bidding
$460,000 CJ est. value
Liberty, IL 62347

Construction of a New Library Building
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Mount Sterling, IL 62353

Cassidy Place Mixed Use
New Construction
Post-Bid
$139,000,000 est. value
Chicago, IL 60654

Chicago Department of Transportation Job Order Contract for Flatwork - Site Work
Post-Bid
Chicago, IL

Site Reconstruction
Results
Streamwood, IL 60107

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

The Avondale Townhomes & Condominiums
New Construction
Construction
Chicago, Schiller Park, IL 60176

North Side Apartment & Office Building
New Construction, Build-Out - 27,500 SF
Construction
Chicago, IL 60654

1150 West Lake Street Mixed Use Development
New Construction, Demolition - 47,000 SF
Pending Verification
$300,000,000 est. value
Chicago, IL 60642

Madison Apartment Complex
New Construction, Renovation
Pending Verification
Oak Park, IL 60301

One Central
New Construction - 22,300,000 SF
Conception
$20,000,000,000 est. value
Chicago, IL

Last Updated 08/26/2022 04:01 AM
Project Title

Water Heater Replacement and Site Improvements

Physical Address View project details and contacts
City, State (County) Barry, IL 62312   (Pike County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Proposal No. 1: IL-71-1, 2, and 10/Barry, IL-71-3/Pleasant Hill, IL-71-4/Griggsville, IL-71-5/Perry, IL-71-6/Baylis, IL-71-9/Pittsfield, IL-71-13 & 15/Pittsfield, and IL-71-14/New Canton Remove and replace existing water heaters, including expansion tanks and water heater shut-off valves and remove and replace dwelling unit main water valves. Proposal No. 2: IL-71-1, 2, and 10/Barry, IL-71-3/Pleasant Hill, IL-71-4/Griggsville, IL-71-5/Perry, IL-71-6/Baylis, IL-71-9/Pittsfield, IL-71-13 & 15/Pittsfield, and IL-71-14/New Canton Construct site signage at each site. Replace the dwelling units address plates at designated projects. Remove designated trees and plant trees. This project has a construction estimate of: Proposal No. 1: under $300,000 and Proposal No. 2: under $150,000 In accordance with Clause No. 9, Bid Guarantee, of the Instructions to Bidders, all bids must be accompanied by a negotiable bid guarantee in the form of a certified check or bank draft, payable to the Pike County Housing Authority, U.S. Government Bonds at par value, or a satisfactory bid bond executed by the Bidder and acceptable sureties in an amount equal to five percent (5%) of the bid. The surety company must be authorized to do business in the state where the project is located and must be acceptable to the Government. If the bid guarantee is not submitted with the bid, the PHA will reject the bid Proposals shall be made on unaltered bid forms which are incorporated herein. All blank spaces shall be completed. Proposals shall be signed with name typed below signature. When bidder is a corporation, proposals must be signed with the legal name of the corporation followed by the name of the state of incorporation and the legal signature of an officer authorized to bind the corporation to a contract. The successful bidder will be required to furnish and pay for satisfactory performance and payment bond or bonds or furnish a 20 percent cash escrow or a 25 percent irrevocable letter of credit acceptable to the Housing Authority all in accordance with Clause No. 10, Assurance of Completion, of the Instructions to Bidders. Attention is called to the provisions for equal employment opportunity and that payment of not less than the minimum salaries and wages as set forth in the Specifications must be paid on this project. Any State rate that exceeds the corresponding Federal rate is inapplicable and shall not be enforced. All bidders shall submit with each bid, the Contractor's Affirmative Action Certification to comply with the provision for equal employment opportunity. Representations, Certifications and Other Statements of Bidders, Form HUD-5369-A shall be submitted with the bid. Bidders shall carefully examine the documents and construction site to obtain firsthand knowledge of the existing condition. Contractors will not be given extra payments for conditions which can be determined by examining the site and documents. The Housing Authority reserves the right to reject any or all bids or to waive any informalities in the bidding. No bid shall be withdrawn for a period of sixty days (60) subsequent to the opening of bids without the consent of the Housing Authority. Partial sets may be purchased at the cost of photocopying and shipping cost upon completion of a request for partial plans/specifications form and submitting to the Architect. Proposal forms and contract documents, including plans and specifications, are on file at the office of the Housing Authority and at the office of Eggemeyer Associates Architects, Inc., 3029 South Park Ave./P. O. Box 640, Herrin, Illinois 62948; Phone No.:(618)988-2380

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents