Similar Projects
Laguna Creek Trail - Crossing at State Route 99 - WTL016 - City of Elk Grove
Infrastructure
Conception
$6,320,000 est. value
Elk Grove, CA 95624

Willard Parkway Landscaping Epoch Drive To Kammerer Road - WFL011 - City Of Elk Grove
Alteration
Conception
$875,400 est. value
Elk Grove, CA 95757

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove
Infrastructure
Design
$3,164,000 est. value
Elk Grove, CA

Roadway Excavation, Place Cl2 Ab, HMA and RHMA, and Modify Ramp Meters
Infrastructure
Bidding
$28,000,000 est. value
CA

Place HMA, Furnish Polyester Concrete Overlay, and Concrete Barrier
Infrastructure
Bidding
$4,490,000 est. value
Sacramento, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Cold Plane AC Pavement, Place HMA and Replace Concrete Slabs
Infrastructure, Alteration
Post-Bid
$4,860,000 est. value
CA

Upper Multi-Purpose Area Repairs and Improvements Kiefer Landfill
Infrastructure
Results
$225,000 est. value
Sloughhouse, CA 95683

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Results
$5,400,000 est. value
Sacramento, CA

Elk Grove Florin Road Complete Street And Resurfacing Project - WTR078 - City of Elk Grove
Infrastructure
Conception
$2,894,158 est. value
Elk Grove, CA 95757

Construct Two Auxiliary Lanes and Upgrade Four Ramp Metering Systems
Infrastructure, Alteration
Design
$17,583,000 est. value
Elk Grove, CA 95758

Mangini Ranch Phase 2 Village 3 Joint Trench
Infrastructure
Bidding
$350,000 est. value
Folsom, CA

Duckhorn Drive Safety Improvement Project
Infrastructure
Post-Bid
$470,000 est. value
Sacramento, CA 95834

Hot Mix Asphalt (HMA) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
CA

Last Updated 07/08/2022 08:53 AM
Project Title

Laguna Boulevard Right Turn Lane to West Stockton Boulevard - WTR058 - City of Elk Grove

Physical Address View project details and contacts
City, State (County) Elk Grove, CA 95758   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will convert the existing right turn lane into a westbound thru lane, construct new right turn lane and Class II bike lane with video detection.The project is located at the intersection of Laguna Blvd. and W. Stockton Blvd. As of July 07, 2022 , this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for Fiscal Year 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents