Similar Projects
Wild Eggs Restaurant
Build-Out - 4,800 SF
Conception
$240,000 est. value
Jeffersontown, KY 40299

Safety Improvements on KY-80 from Leslie County Line to KY-451
Infrastructure
Conception
$5,400,000 est. value
Hazard, KY 41701

Installing a New Overlay on the Tennis Courts at Robert Westrick Memorial Park
Infrastructure
Bidding
$500,000 CJ est. value
Carrollton, KY 41008

East Marshall New Fire Station
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Gilbertsville, KY 42044

Road Stabilization
Post-Bid
Williamsburg, KY 40769

District Wide Paving and Restoration of Driveways and Parking Areas
Alteration
Post-Bid
Murray, KY

Asphalt Paving, Sealcoat & Striping
Term Contract
Results
KY

Dell Street and Dell Court Street Improvements
Results
Less than $75,000 est. value
Florence, KY 41042

Chipotle Mexican Grill
New Construction
Pending Verification
Owensboro, KY 42301

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
Less than $10,660,000 est. value
Glasgow, KY 42142

Sidewalks and Curbs at the William L. Wheeler Hall of Justice
Infrastructure
Bidding
$200,000 CJ est. value
Carrollton, KY 41008

Engineering Services for Bridge Design - Buffington Bridge Replacement
New Construction, Renovation
Post-Bid
Elsmere, KY

Asphalt Resurfacing
Results
KY

Address Pavement Condition of I-75 Non-Cardinal Direction(S)
Infrastructure
Conception
Less than $1,250,000 est. value
Williamstown, KY 41097

Asphalt
Infrastructure
Post-Bid
KY

Last Updated 07/26/2022 04:34 PM
Project Title

Burger King #29711 / Grayson

Physical Address View project details and contacts
City, State (County) Grayson, KY 41143   (Carter County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

*As of July 26, 2022, a general contractor has been awarded, however their contact details have not been disclosed. Plans call for site work and new construction for a new restaurant. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff.

Details

1 Story Above Grade, 3,352 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents