Last Updated | 03/24/2022 03:41 PM |
Project Title | Design-Build Services for Replace Power Plant Phase II |
Physical Address | View project details and contacts |
City, State (County) | Elgin, IL 60123 (Kane County) |
Category(s) | Industrial/Manufacturing, Medical |
Sub-Category(s) | Hospital, Power Plant |
Contracting Method | Competitive Bids. |
Project Status | Contract Award |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | South of Middle Road and north of the Rehab Center on the curb surrounded lawn area This procurement is being solicited using a Two-Phase RFP process authorized by the Design-Build Procurement Act (30 ILCS 537/1 et seq.). Following the review, evaluation, and rating of the Phase I proposals, the CDB may select at least two (2), but not to exceed six (6), of the highest rated offerors/contractors to submit a Phase II technical and cost requirements package and to participate in the Phase II process of this RFP. Phase II offerors shall provide a technical and cost proposal for consideration by CDB. The CDB will then review and evaluate the technical and price proposals of the Phase II offerors. Evaluations will be conducted in accordance with CDB’s Rules and Regulations and the evaluation criteria set out in Sections 00 51 00 – PROPOSAL EVALUATION AND BASIS FOR AWARD, 00 51 01, and 00 51 02 of this RFP. Interviews for firms selected to participate in Phase II will be November 17, 2021, with additional interviews on November 18, 2021, if necessary. The 8 person limit indicated in the Standard documents for Design-Build will not be enforced. However, please respond as requested in the Phase II Invitation to indicate how many people will be present to represent your team. The location for the new power plant will be located south of Middle Road and north of the Rehab Center on the curb surrounded lawn area. The existing power plant will be abandoned in place and no demolition will be required as part of this project. The proposed site for the new power plant included a hospital building. The building was demolished in 1997. Elements of the project include constructing a new power plant on the Elgin campus which will provide sufficient power and steam to serve campus demand. The new power plant’s equipment will provide a reliable and economical central heating and power facility. Components of this project will be reviewed for eligible grants or rebates from the utility company. Major design features will include the following elements: • New steam and electrical generation • Decommissioning of the existing power plant • Required infrastructure expansion or modification • Maintenance workspace and vehicle storage • On-site fuel for backup generation • Alternate 1: Remote storage for road salt • Alternate 2: Asbestos abatement of the existing power plant |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Hospital, New Construction, Power Plant, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |