Similar Projects
Allegheny Health Network Health & Sports Complex - Phase I
New Construction - 20,000 SF
Conception
$8,000,000 est. value
Coraopolis, PA 15108

Harrison Point - Master Plan
New Construction - 185,000 SF
Conception
$10,000,000 CJ est. value
Tarentum, PA 15084

Laboratory/Research Services
Renovation, Addition - 284,520 SF
Design
$120,000,000 est. value
Pittsburgh, PA 15213

Renovate Prosthetics at HZ
Renovation
Design
Pittsburgh, PA 15215

R--Construction Management Support Services
Post-Bid

Y--Construction
Post-Bid
$20,000 to $50,000 est. value
Pittsburgh, PA 15240

USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

Cancer Treatment Center
Addition - 63,000 SF
Construction
$35,000,000 est. value
Monroeville, PA 15146

ERC Behavioral Health Driveway and Garage
Renovation - 31,799 SF
Construction
$1,500,000 est. value
Pittsburgh, PA 15213

Hospital Lobby Addition
Addition
Conception
Monroeville, PA 15146

West Penn Hospital
Renovation
Design
$960,000 est. value
Pittsburgh, PA 15224

Allegheny Health Network AC-BB+J Relocation
Renovation - 4,810 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Pittsburgh, PA 15216

AGH Academic Cancer Center
New Construction, Addition - 90,000 SF
Construction
$90,000,000 est. value
Pittsburgh, PA 15212

Magee Hospital Emergency Power Upgrades/Generator Building Addition
Renovation
Design
$35,000,000 est. value
Pittsburgh, PA 15213

Central Sterile Facility
New Construction
Construction
$2,508,000 est. value
Pittsburgh, PA 15219

Last Updated 02/28/2019 03:15 PM
Project Title

Gamma Pod - Level 02

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15212   (Allegheny County)
Category(s) Medical
Sub-Category(s) Hospital, Medical Office/Outpatient
Contracting Method
Project Status Construction Commenced January 2018, Construction Complete as of February 2019
Bids Due View project details and contacts
Estimated Value $395,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Complete renovations required to fitout space in the Radiation Oncology department on Ground Floor(02) at Allegheny General Hospital to house a new Gamma POD. This renovation also includes the relocation of administrative offices and support areas.
Details 1 Hospital, 1 Story Above Grade, 8,500 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents