Similar Projects
Shining Mountain Waldorf School - Master Plan - 11.6 acres
New Construction, Addition - 146,596 SF
Conception
Boulder, CO 80304

Copper Rose Apartments
New Construction - 6,114 SF
Conception
$500,000 to $1,000,000 CJ est. value
Colorado Springs, CO 80902

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Second Creek Farms
New Construction
Design
Commerce City, CO 80022

Design/Build - Reed Park Improvements
Renovation
Bidding
$400,000 est. value
Fruita, CO 81521

Repair to Cruz Bay Visitor Center, Docks, and Surrounding Grounds Impacted by Hurricanes Irma and Maria
Renovation
Bidding
$5,000,000 to $10,000,000 est. value
Denver, CO

Cottage Park Playground Equipment
Post-Bid
Lakewood, CO 80226

Playground Surface Repair - Martinez Elementary School
Post-Bid
Greeley, CO 80631

Falcon Regional Park Phase 2
Results
Falcon, CO 80106

Wall Reconstruction at Forsberg Iron Springs Park
Results
Lakewood, CO 80228

Basalt River Park - Phase I & II
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Basalt, CO 81621

Construction Manager at-Risk / GC - Erie Community Park Final Phase
Construction
Less than $5,350,000 est. value
Erie, CO 80516

Springs at Pena Station
New Construction
Pending Verification
Denver, CO 80249

Fisher Farm Subdivision
New Construction
Pending Verification
Timnath, CO 80731

Aspen Knolls Third Subdivision and Aspen Knolls Addition
New Construction
Design
Loveland, CO 80537

Last Updated 06/03/2022 05:05 PM
Project Title

Playground Equipment Removal and Installation

Physical Address View project details and contacts
City, State (County) Lafayette, CO 80026   (Boulder County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contract work to be performed consists of furnishing all required labor, materials, equipment, implements, parts, and supplies necessary for the removal of old playground equipment, EFW and poured in place fall material, design and install new playground equipment, safety surface installation at Two park locations: Cottonwood Park & John Breaux Park. Please bid each site separately The playground equipment should include play components for children ages 2-12 with an emphasis on equipment designed for children ages 2-8. The equipment can be provided in one or more structures. The playground should accommodate the widest possible range of activities that will promote physical fitness, having fun, and encouraging social interaction. Among the play activities that should be considered are: balancing, climbing, crawling, hanging, imagining, manipulating, pushing, pulling, riding, see-sawing, sitting, sliding, swinging, and whirling. The playground equipment can be made of metal, plastic, or a combination. The playground equipment should be in full compliance with both American Society for Testing and Materials (ASTM) and Consumer Product Safety Commission (CPSC) guidelines. The equipment shall be accessible to the handicapped in accordance with State and Federal laws.Each proposal shall recommend and include safety surface material that is believed to be the best value for the money. A portion of the safety surface shall be handicapped accessible. Proposals must include the cost of the play system equipment, delivery charges, installation charges, safety surface installation and the cost to remove the old play equipment, remove existing fall material and safety surfaces. The successful bidder shall provide all insurance necessary for the installation portion of the project.The area of Cottonwood Park playground is 90’ x 45’ The dimensions of the play area shall not be changed (same footprint). The area for John Breaux Park playground is approximately 61’ x 45’ The dimensions of the play area shall not be changed (same footprint).Clean up job-related debris and leave the playground ready for play.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents