Similar Projects
SR 438 over South Branch Tunkhannock Creek
Infrastructure, Renovation
Conception
$600,000 CJ est. value
Scott Township, PA 18433

Group 4-16-ST 1
Infrastructure
Conception
$4,730,000 CJ est. value
Scott Twp, PA 18447

Parker Fields Townhomes
New Construction, Demolition - 19,536 SF
Design
Clarks Summit, PA 18411

SR 107 over Branch Tunkhannock Creek
Demolition, New Construction, Infrastructure
Design
$425,000 CJ est. value
Scott Township, PA 18414

Riverside Concession / Storage Building
New Construction, Infrastructure - 1,280 SF
Bidding
$209,000 CJ est. value
Taylor, PA 18517

County of Lackawanna Transit System (COLTS) Transit Facility
New Construction, Infrastructure
Bidding
$2,900,000 CJ est. value
Scranton, PA 18504

Russel Park Apartments
Renovation
Post-Bid
Carbondale, PA 18407

Parodi Lofts Apartments
Renovation - 50,800 SF
Post-Bid
Scranton, PA 18508

Residential Lots
Infrastructure
Results
$33,000 est. value
Taylor, PA

Archbald Borough - Hill and Rock Street Stormwater Improvement Project - Phase I
Infrastructure
Results
$422,673 CJ est. value
Archbald, PA 18403

Home Ownership Center - Phase 2B Sitework
Renovation, Infrastructure
Construction
$99,921 est. value
Scranton, PA 18504

SR 81 over Leggetts Creek Bridge Preservation
Infrastructure
Construction
$3,325,780 CJ est. value
South Abington Township, PA 18411

Senior Apartments
New Construction
Pending Verification
Dunmore, PA 18512

Bucktown Center
New Construction - 5,200 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Dunmore, PA 18512

Group 4-22-ST 1
Infrastructure
Conception
$2,000,000 CJ est. value
Scranton, PA 18503

Last Updated 01/17/2023 05:07 PM
Project Title

Elevator/Vestibule Addition At Blakely High-Rise PA38-13

Physical Address View project details and contacts
City, State (County) Blakely, PA 18452   (Lackawanna County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This Invitation is extended by the Housing Authority of the County of Lackawanna for the construction of the described project. Sealed bids are invited for a single prime contract for Blakely High-Rise Elevator Addition, Railroad Avenue Blakely Pa. The Housing Authority of the County of Lackawanna in accordance with Title IV of the U.S. Civil Rights Act of 1964, notifies all Bidders that it will affirmatively insure that they will be afforded full opportunity to submit Bids in response to this invitation and that no person will be discriminated against on the grounds of race, color, sex or national origin in consideration for an award. Attention is called to Section 3 of the HUD Act of 1968, Section 3 helps create employment for low-income people or that provide employment to low-income people. Description of Work: The work of this project generally includes construction of a five-story masonry elevator/vestibule addition to the existing five-story apartment building including an Otis Traction Elevator or equal in accordance with Plans and Specifications prepared by KBA Engineering, p.c., Project Architect/Engineer. Work Includes General Construction (including Sitework, HVAC Construction, Plumbing and Electrical Construction). Receipt of Bids:The bid must be accompanied by a Certified Check or Bid Bond in the amount of (10%) of the Bid amount, made payable to H.A.C.L. The Housing Authority reserves the right to reject any or all Bids or portions thereof or to waive any informalities in the Bidding. Documents may be reviewed at the office of KBA or the LCHA Administrative Office located at 2019 W Pine Street Dunmore, PA 18512 during normal business hours (M-F 9:00 AM until 3:00 PM) . All requests for documents will require the following information to be submitted with the request: The requesters name, company name, contact name, address, telephone number and email address. Prime Contractors purchasing bid documents must register when purchasing documents to ensure that they will receive information issued during the bidding period. Performance Bonds: Successful bidders will be required to furnish and pay for Performance and Labor and Material Bonds which are acceptable to the Housing Authority of the County of Lackawanna. Bidders proposals must be accompanied by a certified check, certified bank treasurers check, bank cashiers check or bid bond in the form provided in the Contract Documents. To request electronic documents contact KBA Engineering, p.c. by email at mchale@kbapc.net or at the following address or phone number: KBA Engineering, p.c. 25 South Washington Avenue Jermyn, PA. 18433 Phone: 570-876-5744 Fax: 570-876-4299 A satisfactory corporation surety shall provide security in an amount equal to 10% of the base bid. The surety shall name as payee or obligee the Lackawanna County Housing Authority. A Non-Collusion Affidavit of Contractor will be required to be signed and notarized prior to the award of any contract. A no-lien agreement will be required to be signed and filed by the contractor before any work begins on the project. All proposals shall be irrevocable for sixty (60) days after bid opening date, unless delayed due to required approvals of another governmental agency, and shall be accompanied by 10% bid guaranty, payable to the Owner. The Owner reserves the right to reject any or all bids and to waive any or all irregularities, mistakes, omission informalities relative thereto. Wage Requirements; Equal Employment Opportunity: Attention is called to the wage and equal employment opportunity requirements of this project, as contained in the Bid Documents. All workers employed on this project shall receive the proper wages for the particular job(s) they are doing according to the Wage and Hour Schedule included in this Specification. Prevailing wages as established under the Davis-Bacon Act will apply to this contract. The contract documents contain requirements addressing prevailing labor rates, nondiscrimination in hiring practices, specifications and related matters The work of this project generally includes construction of a five-story masonry elevator/vestibule addition to the existing five-story apartment building including an Otis Traction Elevator or equal in accordance with Plans and Specifications prepared by KBA Engineering, p.c., Project Architect/Engineer. Work Includes General Construction (including Sitework, HVAC Construction, Plumbing and Electrical Construction) The contractor shall furnish all labor, materials, equipment, machinery, apparatus and tools and perform all operations necessary to install, equip, adjust and to put into satisfactory operation the work of the project, including installation of an Otis Gen-3 3500 lb., 200 fpm gearless machine-room less electric traction elevator and shall so connect the various items or sections of the work so as to form a complete and operating whole.

Details

5 Stories Above Grade, Addition, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents