Similar Projects
Locust Street; 2nd Street to Fonner Park Road - City of Grand Island
Infrastructure
Conception
$450,000 CJ est. value
Grand Island, NE 68801

RFP Construction Management at Risk - Construction Management at Risk Services for a School Facilities Improvement Project
Demolition, New Construction, Build-out, Infrastructure
Design
$27,000,000 CJ est. value
Cairo, NE 68824

Parking Lot Upgrades
Infrastructure
Bidding
$200,000 CJ est. value
Grand Island, NE 68801

Richard Plautz Crane Viewing Site Trail Improvements
Infrastructure
Post-Bid
$320,000 est. value
Grand Island, NE

Soil Purchasing, Excavating and Hauling
Infrastructure
Post-Bid
Doniphan, NE

Burdick Pumping Station Check Valves
New Construction
Results
$55,000 est. value
Grand Island, NE

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Grand Island Central Catholic Elementary School
Addition, New Construction, Infrastructure - 27,500 SF
Pending Verification
$9,000,000 CJ est. value
Grand Island, NE 68803

Conestoga Mall Redevelopment
Demolition, New Construction, Infrastructure, Renovation - 200,000 SF
Pending Verification
$200,000,000 CJ est. value
Grand Island, NE 68803

Grand Island Public Schools - Senior High Additions & Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Grand Island, NE 68803

District 4 On-Call Util Location Service
Infrastructure
Results
Less than $5,000,000 est. value

Gates Elementary School Addition and Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$8,500,000 CJ est. value
Grand Island, NE 68803

Curb Ramp Project
Infrastructure
Results
$105,988 CJ est. value
Grand Island, NE 68801

Saturn Street Lift Station Rehabilitation
Renovation
Post-Bid
$430,000 est. value
Alda, NE 68810

Wastewater Treatment Plant Flow Improvements
Renovation, Infrastructure
Results
$7,796,000 CJ est. value
Grand Island, NE 68801

Last Updated 11/28/2022 10:03 AM
Project Title

Waste Stabilization Pond and Improvements

Physical Address View project details and contacts
City, State (County) Doniphan, NE 68832   (Hall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $765,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Lift Stations/Lift Station Equipment. Description: Furnish all equipment, labour, materials and appurtenances required to construct a lift station, new waste stabilization ponds, piping, and other such work as may be incidental to WASTE STABILIZATION POND AND IMPROVEMENTS. United States Department of the Interior Fish and Wildlife Service Nebraska Field Office 9325 South Alda Road Wood River, NE 68883 T: 308-382-6468 F: 308-384-8835 e-mail: eliza hines@fws.go

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents