Similar Projects
Road Maintenance and Repair
Design
Blacksburg, Covington, Edinburg, Harrisonburg, Marion, Natural Bridge Station, Wise, VA

Z--Shen 312442 - Rehabilitate Skyline Drive Pavement Management
Post-Bid
$10,000,000 est. value
Luray, VA

Health Department Pavement Repairs
Post-Bid
Luray, VA 22835

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

2021 Plant Mix
Results
Less than $2,400,000 est. value

Governor's Quad Pavers
Post-Bid
Radford, VA 24141

Small Communities Ops Center Parking Lot and Laydown Area - (Mp013400)
Results
West Point, VA 23181

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

SGR - 2021 Plant Mix
Results
$507,000 est. value
VA

Y--SHEN 312442 Design-Build
Alteration
Post-Bid
Luray, VA 22835

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Asphalt Paving, Sealcoating & Striping
Term Contract
Post-Bid
VA

2022 Latex Modified
Infrastructure
Results
$2,130,000 est. value

SGR - 2022 Plant Mix
Infrastructure
Post-Bid
$665,000 est. value
VA

2022 Surface Treatment
Infrastructure
Results
$875,000 est. value

Last Updated 05/17/2022 10:11 AM
Project Title

Memorial Drive Corridor Improvements Project

Physical Address View project details and contacts
City, State (County) Luray, VA 22835   (Page County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,650,000
Plans Available from Civil Engineer - 03/25/22
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of roadway widening, curb and gutter, entrances, sidewalk, utilities, storm water management, and pavement markings, together with all appurtenances, utility relocations and incidental items required to complete the work. Entire project must be substantially completed by November 15, 2021.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents