Similar Projects
Chiller Maintenance Services
Infrastructure
Design
Detroit, MI 48201

HVAC Repairs and Maintenance
Term Contract
Sub-Bidding
Detroit, MI 48202

Fieldhouse HVAC Retrofit
Renovation
Sub-Bidding
$200,000 CJ est. value
Dearborn, MI 48126

HVAC Maintenance and Repair Service
Alteration
Post-Bid
Highland Park, Livonia, Taylor, Wayne, MI 48180

Chiller System Replacement System
Alteration
Post-Bid
Detroit, MI 48226

CDBG Emergency Furnace Replacement
Results
Taylor, MI 48180

Hvac Improvements Oakwood CSO Facility - 1
Renovation
Results
Detroit, MI

HVAC Air Filters
Term Contract
Sub-Bidding
Detroit, MI 48226

Air Filters for Powerhouse
Term Contract
Post-Bid
Dearborn, MI

2021 Library HVAC Rehabilitation
Results
Wayne, MI 48184

A/C in the Middle School
Alteration
Post-Bid
Harper Woods, MI

Heating and Cooling Services
Alteration
Results
River Rouge, MI 48218

FPM - Beecher House HVAC Improvements - 2021
Alteration
Post-Bid
Detroit, MI 48202

Classroom Ceiling Fan Replacement Monteith Elementary School
Alteration
Results
Grosse Pointe Woods, MI 48236

Mystic Creek Air Conditioning
Alteration
Post-Bid
Dearborn, MI

Last Updated 11/15/2022 01:08 PM
Project Title

Cafeteria Air Conditioning Upgrade at Chandler Park Academy Middle School

Physical Address View project details and contacts
City, State (County) Harper Woods, MI 48225   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Specifications : Four(4) new Vertical Unit Ventilators (VUV's) will be installed to provide heating and cooling for the cafeteria. Quantity : 4.00000 Unit : Actual Pounds The office of: Education Enrichment Services, LLC. (EES) invites your company to participate in providing Bids for CPA Middle School, Cafeteria Air Conditioning Upgrade. Four new vertical unit ventilators (VUV's) will be installed to provide heating and air conditioning for the cafeteria. The VUV's will include a short length of overhead supply air ductwork. Each VUV will be served with a roof mounted condensing unit. A new skid mounted heat exchanger will be used to provide supply and return hot water to the VUV's in order to provide heating. Gravity relief and intake hoods will be provided to serve the cafeteria space. Small portions of the cafeteria ceiling will be removed in order to accommodate the installation of piping. New ceiling will be installed where the existing ceiling is removed. A new electrical power panel will be installed, as well as, electric services for new mechanical equipment requiring the same. Withdrawal of any bid is prohibited for a period of thirty (30) days after the actual date of the bid's due date. The successful bidder is required to furnish Payment (Labor and Materials) and Performance Bonds, in the amounts (100%) of their contracts, executed by a surety acceptable to the owner and which is licensed to do business in the State of Michigan. Chandler Park Academy (CPA) / Education Enrichment Services. L.L.C. (EES) reserves the right to reject any or all bids, either in whole or in part, to reject a bid for data required by the bidding documents or to reject a bid which is in any way incomplete or irregular and to waive informality and irregularity in the bids and in bidding. CPA/EES reserves the right to accept alternates in any order or combination and to determine the successful bidder on the basis of the sum of the base bid and the alternates accepted.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents