Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Belles Road Project
Infrastructure
Post-Bid
Orangeville, PA 17859

SR 339 From Smith Hollow Rd to Nescopeck Boro
Infrastructure
Results
$10,000,000 to $12,499,999 est. value
Nescopeck, PA 18635

Taylor Road Project
Infrastructure
Results
Millville, PA 17846

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Laubach Drive Steam Line Replacement
Infrastructure, Alteration
Post-Bid
Bloomsburg, PA 17815

I-80 from Reichart Rd to SR 11
Infrastructure
Results
$7,500,000 to $9,999,999 est. value
PA

SR 487 over Abandoned RR
Infrastructure
Conception
$2,210,000 CJ est. value
Scott, PA 17815

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$4,171,810 CJ est. value
Brecknock Township, PA 19540

DSA Placement Contract
Infrastructure
Post-Bid
Elysburg, PA

Last Updated 04/25/2023 06:05 AM
Project Title

SEDA-COG HFST

Physical Address View project details and contacts
City, State (County) Millville, PA 17846   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $993,752 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The description and location of the project are as follows: Application of High Friction Surface Treatment and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 42, SECTION 132, in COLUMBIA, MONTOUR, NORTHUMBERLAND, and SNYDER COUNTIES, VARIOUS TOWNSHIPS at numerous locations within those counties. Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: RESURFACING/OVERLAYS 408 Version: 2020-5 PADOT - SEDA-COG HFST *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents