Similar Projects
Scum Drying Beds 2021
Renovation, Alteration
Post-Bid
Cutler, CA 93615

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Post-Bid
Anaheim, CA

Laguna Treatment Plant Filter Valves and Actuators Replacement and Aeration Basins Improvements
Renovation
Bidding
Santa Rosa, CA 95401

Water Pollution Control Plant Oxidation Pond Levee Maintenance
Renovation, Term Contract
Post-Bid
Sunnyvale, CA

Development Of Calaveras County Water District Emergency Response Plan For Compliance With America Water Infrastructure Act Of 2018
New Construction
Post-Bid
CA

Poppy Ridge Groundwater Treatment Plant Phase 2
Renovation
Bidding
$11,364,000 est. value
Elk Grove, CA 95757

Operations And Maintenance Of County Maintained Wastewater Treatment Plant And Wastewater Treatment System
Renovation
Post-Bid
Redwood City, CA

San Jose State University Water Treatment
Term Contract
Bidding
San Jose, CA

Oxnard Wastewater Treatment Facility Reliability Improvements
Renovation
Post-Bid
Oxnard, CA 93033

Water Treatment of Mechanical Systems
Renovation, Alteration
Post-Bid
Thousand Oaks, CA 91362

Air Board Compliance Monitoring and Reporting
Renovation, Term Contract, Infrastructure
Bidding
Bakersfield, CA 93301

San Diego County Water Authority POW-5 Turnout and Flow Control Facility Project - WT040
New Construction, Infrastructure
Bidding
$4,800,000 to $6,480,000 est. value
Poway, CA 92064

Last Updated 10/14/2021 09:42 AM
Project Title

MCWD Well 4 TCP and Nitrate Mitigation Project

Physical Address View project details and contacts
City, State (County) Bakersfield, CA 93313   (Kern County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,432,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of furnishing all labor, materials, and equipment necessary to construct one (1) new Granular-Activated Carbon treatment facility in the Mettler, including demolition and clearing, site grading, fencing, surfacing, yard piping, interconnecting piping to Well 4, GAC system, concrete foundations, backwash supply pumps, chlorinator system, backwash pond, and replace electrical and control systems.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents