Similar Projects
CyRide Building Water Main Replacement - City of Ames
Infrastructure
Conception
$750,000 est. value
Ames, IA 50011

Clear Creek Bank Stabilization (North of Oakland Street) - City of Ames
Infrastructure
Conception
Ames, IA 50014

Collins Maxwell Bus Barn
New Construction, Infrastructure
Design
$797,000 CJ est. value
Maxwell, IA 50161

Unit 8 Superheat Replacement - City of Ames
Renovation, Infrastructure
Design
$6,550,000 CJ est. value
Ames, IA 50010

Construction of Dairy Farm Cow Bedding System Conversion
New Construction, Infrastructure
Bidding
$125,000 CJ est. value
Ames, IA 50014

Take 5 Car Wash / Ames
New Construction, Infrastructure - 4,219 SF
Bidding
$1,000,000 CJ est. value
Ames, IA 50010

Building 21 Electrical Service Connection, USDA Campus, Ames
Renovation
Sub-Bidding
$250,000 CJ est. value
Ames, IA 50010

Fencing for Inis Grove Tennis Courts and Sand Volleyball
Infrastructure
Sub-Bidding
$40,000 CJ est. value
Ames, IA 50010

Electric Vehicle Charging Station Installation
Term Contract
Post-Bid
Less than $25,000 est. value
Ames, IA 50010

Ames Industrial Park Development RFP
Infrastructure
Post-Bid
Ames, IA 50010

Water System Improvements - Shallow Well 7
Infrastructure
Results
Huxley, IA

Transmission Modifications
Infrastructure
Results
$590,000 est. value
Ames, IA 50010

Coal Yard Reclamation - City of Ames
Infrastructure
Conception
$450,000 est. value
Ames, IA 50010

Distribution System Monitoring Network - City of Ames
Infrastructure
Design
$985,000 CJ est. value
Ames, IA 50010

RFP - Baker Subdivision
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Ames, IA 50014

Last Updated 08/09/2022 09:04 AM
Project Title

Cooling Tower Blowdown Modification for Electric Services

Physical Address View project details and contacts
City, State (County) Ames, IA 50010   (Story County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Electric, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $329,344 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Ames is seeking bids from qualified contractors to modify the cooling town blowdown spray to flow to the sanitary sewer. Written questions and requests for exceptions and clarifications are due July 18, 2022 by 5:00 p.m. local time.

Details

Division 26 - Electrical.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents