Similar Projects
HVAC Installation and Energy Infrastructure
Alteration
Post-Bid
Union City, CA

Highland Hospital Koret Building Exhaust Fan and Waterproofing
Alteration
Post-Bid
$1,900,000 est. value
Oakland, CA

Henry Robinson Multi-Purpose Center HVAC Replacement
Alteration
Results
$650,000 est. value
Oakland, CA 94612

Harvest Park Middle School Gym Boilers Replacements
Alteration
Results
Pleasanton, CA 94566

HVAC A-E and Construction Management Services
Renovation, Term Contract
Post-Bid
Less than $65,000,000 est. value
Livermore, CA 94550

HVAC Repairs
Alteration
Results
Oakland, CA 94612

District Wide Roofing and HVAC Replacement Project Package Five
Alteration
Post-Bid
Pleasanton, CA 94566

HVAC Repairs
Alteration
Results
CA

Regular and On-Call Heating, Ventilation, and Air Conditioning (HVAC) Services
Alteration
Post-Bid
Livermore, Martinez, Oakland, Oakley, Redwood City, Richmond, San Jose, San Pablo, Vallejo, CA 94603

USCG Alameda Replace HVAC and Roofs
Infrastructure
Results
$500,000 to $1,000,000 est. value
Alameda, CA

HVAC Services at Northern California DWR Facilities
Alteration
Post-Bid
Byron, CA 94514

Relocate HVAC Ductwork and Furnish and Install Fire/Smoke Dampers (Alameda County)
Alteration
Results
$388,000 est. value
Oakland, CA 94612

Air Intake Dampers Replacement Services
Alteration
Post-Bid
Oakland, CA 94612

O'Brien Hall HVAC Improvements
Alteration
Results
$160,000 est. value
Berkeley, CA

Hvac Preventive Maintenance And As Needed Repair Services
Term Contract
Post-Bid
CA

Last Updated 04/02/2023 02:32 PM
Project Title

Oakland High School Boiler Replacement

Physical Address View project details and contacts
City, State (County) Oakland, CA 94610   (Alameda County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes but not limited to Demolition and removal of two existing boilers, and related controls from the boiler room. Abatement if all hazardous materials based on ACC environmental report attached. A full inspection of the existing expansion tank for its condition and replace if necessary. Dispose all debris. Installation of two boilers (2) with 2,000,000 Million BTU's with a minimum of 84% efficiency. Installation of the flow switches. Installation of two (2) supply pumps (circulation pumps). Installation of(Low water cutout-High limit control) if the boiler is not equipped with these features. Connect Boilers to existing flue pipe. Floor drain and the natural gas is available at the boiler room. Complete training at the completion of the project. Provide As-Builds, Operational Manuals, and Warranties upon completion of the project will be required. Listed below are the recommended manufacturers for this project. Boiler types: Raypak, Peerless, Weil McLain, Camus. Circulation pumps: Taco, B&G, General Electric (most recommended) Gauges: U.S Gauges, Marsh, Danton Bids must be accompanied by a bidder's bond, cashier's check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner, as detailed in the Contract Documents. Project Manager is Marcus Board, who can be reached at: marcus.board@ousd.org and/or 510-277-6719. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. The Contract Time shall be 60 calendar days, and liquidated damages for delay shall accrue. The deadline for Completion is TBD. See Article III of the Agreement for details.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents