Similar Projects
Last Updated | 04/02/2023 02:32 PM |
Project Title | Oakland High School Boiler Replacement |
Physical Address | View project details and contacts |
City, State (County) | Oakland, CA 94610 (Alameda County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Selection Underway, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of work includes but not limited to Demolition and removal of two existing boilers, and related controls from the boiler room. Abatement if all hazardous materials based on ACC environmental report attached. A full inspection of the existing expansion tank for its condition and replace if necessary. Dispose all debris. Installation of two boilers (2) with 2,000,000 Million BTU's with a minimum of 84% efficiency. Installation of the flow switches. Installation of two (2) supply pumps (circulation pumps). Installation of(Low water cutout-High limit control) if the boiler is not equipped with these features. Connect Boilers to existing flue pipe. Floor drain and the natural gas is available at the boiler room. Complete training at the completion of the project. Provide As-Builds, Operational Manuals, and Warranties upon completion of the project will be required. Listed below are the recommended manufacturers for this project. Boiler types: Raypak, Peerless, Weil McLain, Camus. Circulation pumps: Taco, B&G, General Electric (most recommended) Gauges: U.S Gauges, Marsh, Danton Bids must be accompanied by a bidder's bond, cashier's check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner, as detailed in the Contract Documents. Project Manager is Marcus Board, who can be reached at: marcus.board@ousd.org and/or 510-277-6719. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. The Contract Time shall be 60 calendar days, and liquidated damages for delay shall accrue. The deadline for Completion is TBD. See Article III of the Agreement for details. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |