Similar Projects
Canal Street Pump station
New Construction
Bidding
$770,000 est. value
Flemington, PA 17745

Whitehorse Road Pumping Station Flood Protection Upgrades
Renovation
Bidding
$800,000 est. value
PA

Flowers Road Pump Station Construction General/Mechanical
Post-Bid
Derry, PA 15627

Tanker Filling Station
Post-Bid
Renovo, PA

Furnishing 35 Grinder Pumps and 2 Spare Grinder Pump Cores
Results
Johnstown, PA 15904

Influent Pump Station Upgrades - General Construction
Results
Willow Grove, PA 19090

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 1 - General Construction
Construction
$6,000,000 to $8,500,000 est. value
Reading, PA 19601

Maple Grove Sewage Pumping Station and Interceptor Expansion - General Construction
Construction
$1,400,000 est. value
Lancaster, PA 17603

Equalization Tank Pumping Station and Force Main Improvement Project
Renovation, Infrastructure
Bidding
$400,000 est. value
Shavertown, PA

Patch Pump Station Upgrades Project
Post-Bid
$120,000 est. value
Black Lick, PA

National Pike Water Authority Pump Station No. 1 Upgrade
Results
Markleysburg, PA 15459

East Halls Pump Station Upgrades
New Construction, Demolition
Construction
$1,980,000 est. value
University Park, PA

Broad Mountain and Mount Laurel Water Treatment Plant Upgrades
Renovation
Bidding
$2,710,000 to $3,340,000 est. value
Pottsville, PA

Sanders Road Pumping Station Replacement Project
Post-Bid
Fairfield, PA 17320

Peebles Pump Station and Force Main Project - General/Mechanical Construction
Results
$1,200,000 est. value
Allison Park, Pittsburgh, PA 15101

Last Updated 07/08/2022 09:49 AM
Project Title

Pump Station Control Systems

Physical Address View project details and contacts
City, State (County) Coatesville, Warrington, PA (Bucks, Chester Counties)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the replacing the controls systems at three pump stations and regearing the pumps at the stations to operate at a constant speed.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents