Similar Projects
Hot Mix 2021
Post-Bid
Cedar City, UT

Asphalt Parking Lots
Post-Bid
Cedar City, UT 84721

I-15, Hamilton Fort to Cedar City Preservation High Volume
Results
$500,000 to $1,500,000 est. value
Cedar City, UT

Moenave Trail Improvements
Results

Asphalt Parking Lots
Post-Bid
Cedar City, UT 84721

Coal Creek Road Widening Phase II Small Urban
Results
$6,000,000 to $10,000,000 est. value
Cedar City, UT 84721

Asphalt Parking Lots
Post-Bid
Parowan, UT 84761

300 West Reconstruction from 900 South to 2100 South
Results

2021 Streets Project
Post-Bid
Brian Head, UT

I-15 Over East Nichols Canyon Rd (D 762)
Results
$6,000,000 to $10,000,000 est. value
Parowan, UT 84761

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

S Roadway Improvements
Results

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Asphalt Street Crack Seal Chip Seal Asphalt
Infrastructure
Results
Cedar City, UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Last Updated 06/02/2022 06:06 AM
Project Title

Schedule I - Pavement Maintenance

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84721   (Iron County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work involved will include the following: Schedule I - Pavement Maintenance The approximate quantities of major bid items involved in the proposed work are: 13,500 LF Routed Crack Seal 6,300 LF Reseal Crack Seal 80 LF Replace Joint Sealant and Backer Rod 79,000 SY Emulsified Asphalt Seal Coat with Aggregate 28,200 SF Temporary Pavement Markings 28,200 SF Permanent Pavement Markings 6 EA Surface Painted Hold Short Markings Construction for this project is expected to take 8 Working Day(s).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents