Similar Projects
Last Updated | 12/19/2018 04:39 AM |
Project Title | Installation of an Intelligent Transportation System (Its) (22 Closed Circuit Television Cameras, 2 Variable Message Signs, 4 Road Weather Information Systems and 2 Traffic Counting Stations) |
Physical Address | View project details and contacts |
City, State (County) | (Middlesex, Suffolk, Worcester Counties) |
Category(s) | Single Trades |
Sub-Category(s) | Security/Communications |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,437,314 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of an Intelligent Transportation System (ITS) (22 Closed Circuit Television Cameras, 2 Variable Message Signs, 4 Road Weather Information systems and 2 Traffic counting Stations) along Sections of Interstates 95, 195, 295 & 495 and Route 6. "1.000","Ls","Schedule Of Operations - Fixed Price $29500","100." "1.000","Ls","As-Built Survey And Plans","100.9" "88.000","Hr","Tree Trimming - Tree And Stump Removal Crew","102.001" "306.000","Cy","Test Pit For Exploration","141.1" "50.000","Cy","Class b Rock Excavation","144." "1.000","Ls","Environmental Health And Safety Program","180.01" "80.000","Hr","Personal Protection Level c Upgrade","180.02" "100.000","Hr","Licensed Site Professional Services","180.03" "26.000","Ton","Disposal Of Unregulated Soil","181.11" "52.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "39.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "13.000","Ton","Disposal Of Hazardous Waste","181.14" "1.000","Ton","Disposal Of Treated Wood Products","184.1" "320.000","Ft","Drive Sample Boring","191." "40.000","Ft","Hollow Stem Auger Borings","191.10" "40.000","Ft","Core Boring","191.11" "844.000","Ft","Horizontal Directional Drilling","191.311" "850.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "3.000","Ea","Trailing Anchorage","627.1" "5.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "1.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "1.000","Ea","Transition To Thrie Beam","628.25" "25.000","Ft","Highway Guard Removed And Reset","630." "83.000","Ft","Highway Guard Removed And Discarded","630.2" "40.000","Ft","72 Inch Chain Link Fence (Spring Tension Wire) (Line Post Option)","644.072" "12.000","Ft","60 Inch Chain Link Gate With Gate Posts","650.060" "24.000","Ft","72 Inch Chain Link Gate With Gate Posts","650.072" "40.000","Ft","Chain Link Fence Removed And Stacked","665." "135.000","Ft","Chain Link Fence Removed And Reset","666." "45.000","Ea","Silt Sack","697.1" "21.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "4240.000","Ft","Compost Filter Tubes","767.12" "1190.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "170.000","Ft","1.5 Inch Conduit Type Nm - Plastic -(Ul)","804.151" "125.000","Ft","Dual 1-1/2 Inch Conduit Type Nm - Hdpe","804.152" "5625.000","Ft","3 Inch Conduit Type Nm - Plastic -(Ul)","804.31" "60.000","Ft","1 Inch Electrical Conduit Type Rm - Galvanized Steel","806.1" "235.000","Ft","1-1/2 Inch Electrical Conduit Type Rm - Galvanized Steel","806.15" "250.000","Ft","2 Inch Electrical Conduit Type Rm - Galvanized Steel","806.2" "20.000","Ft","3 Inch Electrical Conduit Type Rm - Galvanized Steel","806.3" "64.000","Ea","Electric Handhole - Sd2.023","811.23" "5.000","Ea","Communication Handhole - Sd2.023","811.231" "355.000","Ft","24 Strand Single Mode Fiber Optic Cable","813.251" "60.000","Ft","Cat6 Ethernet Cable – Weatherproof","813.252" "1.000","Ls","Power Service Connection – 95sb-Cctv-0.4","813.801" "1.000","Ls","Power Service Connection – 95nb-Cctv-1.1","813.802" "1.000","Ls","Power Service Connection – 95nb-Cctv-4.2","813.803" "1.000","Ls","Power Service Connection – 95sb-Cctv-4.2","813.804" "1.000","Ls","Power Service Connection – 295sb -Cctv-1.9","813.805" "1.000","Ls","Power Service Connection – 495sb-Cctv-12.2","813.806" "1.000","Ls","Power Service Connection – 495sb-Cctv-14.3","813.807" "1.000","Ls","Power Service Connection – 495nb-Cctv-26.9","813.808" "1.000","Ls","Power Service Connection – 495sb-Cctv-31.3","813.809" "1.000","Ls","Power Service Connection – 195eb-Vms-1.4","813.810" "1.000","Ls","Power Service Connection – 195wb-Vms-6.8","813.811" "1.000","Ls","Power Service Connection – 195wb-Cctv-9.7","813.812" "1.000","Ls","Power Service Connection – 195wb-Cctv-9.9","813.813" "1.000","Ls","Power Service Connection – 195eb-Cctv-12.7","813.814" "1.000","Ls","Power Service Connection – 195eb-Cctv-16.4 & 195wb-Cctv-16.4","813.815" "1.000","Ls","Power Service Connection – 195eb-Cctv-19.4","813.816" "1.000","Ls","Power Service Connection – 195eb-Cctv-23.8","813.817" "1.000","Ls","Power Service Connection – 195wb-Cctv-24.6","813.818" "1.000","Ls","Power Service Connection – 195eb-Cctv-25.1","813.819" "1.000","Ls","Power Service Connection – 6wb-Cctv-68.2","813.820" "1.000","Ls","Power Service Connection – 6eb-Cctv-82.0","813.821" "29.000","Ea","Signal Post And Base Standard - 8 Foot","817.10" "2.000","Ea","Camera Pole With Lowering Device And Foundation - 40 Foot","817.544" "18.000","Ea","Camera Pole With Lowering Device And Foundation - 60 Foot","817.546" "1.000","Ea","Tcs Pole And Foundation – 40 Foot","817.548" "22.000","Ea","Ip Cctv Camera - Ptz Type","819.22" "23.000","Ea","Grounding, Transient Voltage Surge And Lightning Protection","819.231" "20.000","Ea","Camera Pole Mounted Cabinet","819.27" "2.000","Ea","Traffic Counting Station (Tcs)","819.61" "1.000","Ea","Fiber Optic Ethernet Switch","819.741" "21.000","Ea","4g Lte Cellular Modem","819.742" "1.000","Ea","4g Lte Cellular Modem For Tcs","819.743" "4.000","Ea","4g Lte Cellular Modem For Rwis","819.744" "1.000","Ea","24 Position - Fiber Optic Patch Panel","819.745" "22.000","Ea","Remote Power Manager","819.746" "1.000","Ls","Network And System Configuration","819.751" "1.000","Ls","Field Site And Integrated Systems Testing","819.752" "1.000","Ls","Its Equipment Training","819.753" "1.000","Ls","Operations And Maintenance","819.754" "1.000","Ls","Prototype Integration Testing","819.755" "4.000","Ea","Co-Located Road Weather Information System (Rwis)","819.909" "2.000","Ea","Variable Message Sign (Vms), Controller And Pole Mounted Cabinet","824.611" "1.000","Ls","Supports For Overhead Vms 195eb-Vms-1.4","840.311" "1.000","Ls","Supports For Overhead Vms 195wb-Vms-6.8","840.312" "385.000","Day","Traffic Cones For Traffic Management","851.1" "4025.000","Sf","Safety Signing For Traffic Management","852." "1.000","Ls","Temporary Pedestrian Management Guidance System","852.1" "6.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "310.000","Ft","Temporary Barrier (Tl-2)","853.2" "400.000","Ft","Temporary Barrier Removed And Reset","853.21" "340.000","Ft","Temporary Barrier (Tl-3)","853.23" "400.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "1505.000","Day","Truck Mounted Attenuator","853.403" "1.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "1.000","Ea","Temporary Impact Attenuator Unidirectional, Non-Redirective (Tl-2)","853.52" "1.000","Ea","Temporary Impact Attenuator Unidirectional, Non-Redirective (Tl-3)","853.53" "80.000","Day","Temporary Illumination For Work Zone","853.8" "1520.000","Day","Arrow Board","856." "60.000","Day","Portable Changeable Message Sign","856.12" "15200.000","Day","Reflectorized Drum","859." "800.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "15.000","Ea","Traffic Sign Removed And Reset","874.2" "1.000","Ea","Traffic Sign (Take a Break…) And Support Removed And Discarded","874.42" "2.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete For Post Foundation","901.3" | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |