Similar Projects
North Aud Block Infrastructure
New Construction
Conception
$10,000,000 est. value
Buffalo, NY 14203

Z1DA--528A8-18-806 D-Stream Upgrade Site Prep (VA-20-00005571)
Design
$500,000 to $1,000,000 est. value
Albany, NY 12203

Lead Water Service Line Replacements
Term Contract
Post-Bid
Newburgh, NY 12550

Richard Krum Farm
Renovation
Post-Bid
Neversink, NY 12765

Shether Street Water Main Replacement Project
Results
Less than $280,000 est. value
Hammondsport, NY

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

Athenex Manufacturing Facility
Renovation
Construction
Dunkirk, NY 14048

Site Improvements and Building Restoration at Miller House - Town of North Castle
New Construction, Renovation
Construction
$2,700,000 to $3,000,000 est. value
White Plains, NY

Blue Sky Sports Complex Phase I
New Construction
Pending Verification
$2,100,000 est. value
Middletown, NY 10941

All Transportation Network
Renovation - 1,900 SF
Pending Verification
Newburgh, NY 12550

Water Hydrants, Pipe and Valves
Post-Bid
Jamestown, NY 14701

Construction of Foundation, Concrete Work and Site Improvements for the Fire Training Facility
Results
Middletown, NY

Additions, Renovations and Site Improvements at the Bronxville School
Renovation, Addition
Construction
Bronxville, NY 10708

Hot Water Supply Repair
Post-Bid
Binghamton, NY 13904

Installation of Cone Valves at East Delaware Tunnel Outlet
Results
$721,650 to $976,350 est. value
Neversink, NY 12765

Reported 10/24/2020 12:00 AM
Project Title

Downtown Grant Program - 15 Clinton Street Renovations - Water Main Service

Physical Address View project details and contacts
City, State (County) Plattsburgh, NY 12901   (Clinton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Excavation of Protection Alley, rear of 15 Clinton Street, for the installation of a new 2” waterline from City watermain into basement of 15 Clinton Street Includes tap to City main and basement shutoff. 2. Provide 3 water meters with shutoffs, basement level. 3. Contractor shall provide: Traffic control Compacted fill Finish paving to existing street elevation

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents