Similar Projects
Campbell County Police Station Reroof
Post-Bid
Alexandria, KY

Administrative Building Roof Replacement
Post-Bid
Cadiz, KY 42211

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Phase I Parkway Place (Ky 1-3) Roof Replacement
Post-Bid
Louisville, KY 40216

Campbell County Schools Roofing
Results
Alexandria, KY

Boone County Schools Roofing 2020
Post-Bid
Florence, KY 41042

Sharp Middle School Roof
Results
Less than $368,000 est. value
Butler, KY

Project Howell Elementary School Roofing 2020
Post-Bid
Elsmere, KY 41018

Replace a Barn Roof
Results
Independence, KY 41051

Roofing Envelope Services
Post-Bid

Replace Basement Windows at Golden Tower With Some Limited Acoustical Ceiling and HVAC Work
Results
Covington, KY

Reported 04/08/2021 12:00 AM
Project Title

KSR Warehouse Roof Repair

Physical Address View project details and contacts
City, State (County) La Grange, KY 40031   (Oldham County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of removal of existing aluminum foil roof system, installation of new PVC roof system over existing building and providing additional containment of loose interior roof insulation, including the following: Removal existing roofing material. Remove dirt, debris, and adhesives from the metal roof panel surface. Inspect existing roof panels and replace as needed per unit pricing. Install flute filler insulation between ribs of the metal roof panels. Lay approved cover board over the insulation and ribs, and then mechanically fasten to deck. Lay single ply membrane into place. Mechanically fasten membrane. Hot air weld field seams and laps. Custom flash penetrations then treat with a hot air welder. Install new sheet metal edge flashing, trim, gutters and downspouts, etc. Secure loose roof insulation at the interior of the facility.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents