Similar Projects
Last Updated | 07/22/2020 02:34 AM |
Project Title | Construction Services for the Beverly Hills Offsite Force Main |
Physical Address | View project details and contacts |
City, State (County) | Jacksonville, FL (Duval County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | JEA is soliciting Bids from interested and qualified Responsible Bidders for construction services for a new force main (FM) which includes 568’ of 8” PVC open cut pipe, 5,636’ of 12” PVC open cut pipe, 529’ of 14” HDPE horizontal direction drill (HDD) pipe under Edgewood Avenue, and 740’ of 14” HDPE HDD pipe under Lem Turner Road. The upstream end of the FM includes two stubouts for future connections (one for Beverly Hills West Septic Tank Phase-Out (STPO) and the other for Beverly Hills East STPO). The new water mains include replacement of existing 2” galvanized water mains with 315’ of 2” HDPE, 347’ of 4” PVC, 148’ of 6” PVC, & 4,636’ of 8” PVC, all open cut, associated service replacements, new services and additional fire hydrants. The completion of this force main project is anticipated to be the critical path for providing service to the Beverly Hills West STPO project, therefore time is of the essence. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |