Similar Projects
Building 21 Electrical Service Connection, USDA Campus, Ames
Renovation
Sub-Bidding
$250,000 CJ est. value
Ames, IA 50010

Diesel Generator Maintenance
Term Contract
Sub-Bidding
Ames, IA 50010

Uninterruptible Power Supplies (UPS) Maintenance
Term Contract
Post-Bid
Shenandoah, IA - Bellevue, Grand Island, Holdrege, Lincoln, Norfolk, North Platte, NE 68105

Boone AASF Generator Addition
Alteration
Post-Bid
$385,000 est. value
Boone, IA 50036

Polk County Election Office Fire Suppression, Plumbing, Mechanical and Electrical Repairs
Alteration
Results
Des Moines, IA 50309

Transmission Modifications
Infrastructure
Results
$590,000 est. value
Ames, IA 50010

Fiber-To-The-Premise Distribution and Drop Network
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Waverly, IA 50677

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Davenport AASF Generator Addition
Alteration
Results
Davenport, IA 52806

2023 Electrical System Improvements
Renovation
Sub-Bidding
$300,000 CJ est. value
Anthon, IA 51004

Grimes Office Building Lighting Replacement
Alteration
Post-Bid
Des Moines, IA 50319

Surgical Lights and Video Integration System
Term Contract
Results
Less than $8,000,000 est. value
Des Moines, Iowa City, IA - Saint Cloud, MN - Fargo, ND - Fort Meade, SD

OH to UG 2400V Conversion and Mainline Circuit Improvements
Term Contract
Sub-Bidding
$250,000 CJ est. value
Remsen, IA 51050

Emergency Generator Systems Inspection and Maintenance
Alteration
Post-Bid
Des Moines, IA

Peninsula Well Field Power Redundancy
Alteration
Results
Less than $45,000 est. value
Iowa City, IA

Last Updated 02/09/2023 11:35 AM
Project Title

Cherokee Community School District Middle School Lighting Replacement

Physical Address View project details and contacts
City, State (County) Cherokee, IA 51012   (Cherokee County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacement of the original interior lighting fixtures and controls in the Cherokee Middle School. All new replacement lighting fixtures will consist of energy efficient LED technology. The new installations will comply with the International Energy Conservation Code - IECC 2012. Construction Contract: Bids will be received for a single prime contract with the Owner. Each bid shall be made on the form furnished by the Engineer, and must be accompanied by a deposit of money, Certified Check, Cashier's Check, or Credit Union Certified Share Draft, or a Bid Bond to be executed by a corporation authorized to contract as a surety in the state of Iowa, in an amount equal to five percent (5%) of the amount of the Bid, made payable to Cherokee Community School District, Cherokee, Iowa, and may be cashed by the Board as liquidated damages in the event the successful Bidder fails to enter into a Contract and file bond satisfactory to the Board assuring the faithful fulfillment of the Contract and maintenance of said improvements as required by law, the provisions of this notice and the Contract Documents within ten (10) days after acceptance of his Bid.The successful Bidder will be required to furnish a Performance Bond and Material and Labor Payment Bond in an amount equal to one hundred percent (100%) of the Contract Sum, issued by a responsible surety approved by the Board and shall guarantee the faithful performance of the Contract and terms and conditions therein contained and the maintenance of said improvements pursuant to the provisions of the Contract Documents. The Board reserves the right to reject any or all bids, re-advertise for all bids and to waive any or all formalities that may be in the best interest of Cherokee Community School District. Fabrication of new work shall begin immediately after contracts are signed and insurance certificates are approved, on-site work can begin May 30, 2023. Verify final work schedule with Owner and Engineer. The complete system shall be substantially complete by August 23, 2023.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents