Similar Projects
Underground Chilled Water and Heating Water Piping Replacement – Phase 1 Rockville Campus
Bidding
Rockville, MD 20850

Pool Pak, Dectron, Libert, Miscellaneous HVAC Repair And Other Services
Bidding
Rockville, MD

Bldg. 302 Boiler Inspection
Post-Bid
Gaithersburg, MD

Sources Sought - Dust Collector Machine
Post-Bid
Gaithersburg, MD

Replace Hot Water Heater at Maus Warfield Memorial USAR Center in Rockville, MD 20851
Results
Less than $25,000 est. value
Rockville, MD 20851

HVAC System and Installation
Results
Gaithersburg, MD 20877

HVAC Preventative Maintenance and Service
Post-Bid

Thermostat Replacement in Portable Classrooms
Results
Rockville, MD 20850

NIF 4.7T Electronics Room Air Handler & Chilled Water Coil Replacement
Post-Bid
Bethesda, MD 20814

Repair HVAC System in Montgomery County
Results
Less than $100,000 est. value
Gaithersburg, MD

Filters, Air and HVAC
Term Contract
Post-Bid
Gaithersburg, Rockville, MD 20879

Montgomery County Recycling Center Fiber Building HVAC, Ventilation and Vacuum System Installation
Results
Derwood, MD 20855

Gaithersburg Maintenance Facility
Term Contract
Post-Bid
Less than $50,000 est. value
Gaithersburg, MD 20878

HVAC and Mechanical Equipment Preventative Maintenance and Repair Olney Readiness Center
Term Contract
Results
Less than $50,000 est. value
Gaithersburg, MD 20882

Repair of NIST HVAC Equipment and Pumps
Post-Bid
Gaithersburg, MD

Reported 07/18/2020 12:00 AM
Project Title

Request for Information: Boundary Layer Wind Tunnel

Physical Address View project details and contacts
City, State (County) Bethesda, MD   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Boundary Layer Wind Tunnel: contractor shall fabricate, install, commission, and provide documentation for a controlled open-loop wind tunnel.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents