Similar Projects
Northeast Metropolitan Regional Vocational School
New Construction, Infrastructure - 382,610 SF
Sub-Bidding
$249,000,000 CJ est. value
Wakefield, MA 01880

Framingham District Court - Renovation - Sub
Renovation
Sub-Bidding
$4,093,126 CJ est. value
Framingham, MA 01702

Wastewater Treatment Facility Phase 2 Upgrades
Alteration
Post-Bid
$11,600,000 est. value
Hudson, MA

Replace HVAQC System Brigade HQ Building 102 - SUB Bid
Alteration
Post-Bid
$1,000,000 est. value
MA

Central Fire Station HVAC Controls Upgrade
Renovation
Results
$32,500 CJ est. value
Burlington, MA 01803

Remove, Furnish and Install a New Air Compressor at Fire Station 1
Alteration
Results
$95,000 est. value
Dracut, MA 01826

Police H.V.A.C. Repair Project
Renovation
Construction
$89,932 CJ est. value
North Reading, MA 01864

Capen Court - Senior housing (667-1) Chiller Replacement
Renovation
Construction
$234,300 CJ est. value
Somerville, MA 02144

HVAC Trades Labor Projects
Term Contract
Sub-Bidding
$50,000 CJ est. value
Lowell, MA 01854

Replace HVAQC System Brigade HQ Building 102 - GC Bid
Alteration
Post-Bid
$1,000,000 est. value
MA

Watertown Middle School - Second Floor HVAC Upgrade - General Bid
Alteration
Results
$1,400,000 est. value
Watertown, MA 02472

Housing Commission HVAC Improvements
Renovation
Sub-Bidding
$150,000 CJ est. value
Lincoln, MA 01773

Nashoba Valley Technical High School HVAC Controls Upgrade
Alteration
Post-Bid
$400,000 est. value
Westford, MA 01886

Boilers And Water Heaters Replacement
Renovation
Results
$100,000 CJ est. value
Concord, MA 01742

Tyngsborough Police Station HVAC System Installation
Renovation
Sub-Bidding
$300,000 CJ est. value
Tyngsborough, MA 01879

Last Updated 10/09/2023 06:38 AM
Project Title

Auditorium RTU Replacement At Littleton High School

Physical Address View project details and contacts
City, State (County) Littleton, MA 01460   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from MEP Engineer - 09/27/23
Owner View project details and contacts
Architect View project details and contacts
Description

The work required by these specifications shall include furnishing all labor, skill, supervision, tools, construction plant, equipment and materials and performing all operations necessary for the properly completed contract work as shown on the Drawings, as mentioned in these specifications, and as evidently required, to the complete satisfaction of the Engineer. The successful General Bidder will be required to furnish a performance bond, and also a labor and materials payment bond as set forth in the specifications; each bond executed in the full amount of the Contract Price Performance and labor and materials payment bonds shall be T-Listed; Surety Company(ies) shall be listed in the U.S. Treasury Department Circular 570,most recent edition, as amended

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents