Similar Projects
Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Design
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Design
Hines, IL 60141

HVAC and Mechanical Products
Term Contract
Bidding

HVAC Replacement Project Arlington Heights Memorial Library
Bidding
Arlington Heights, IL

Furnace Inspection & Cleaning at Various Sites
Term Contract
Post-Bid
Evanston, Wheeling, IL

Boiler Tune-up at Various Locations
Post-Bid
Arlington Heights, Des Plaines, Evanston, Ford Heights, Franklin Park, Niles, Park Forest, Robbins, Wheeling, IL 60016

HVAC Equipment Replacement
Results
Evanston, IL 60201

2020 HVAC Replacement
Results
Wheeling, IL 60090

Replace Split System Condensing Unit at Pace Northwest Division
Bidding
Arlington Heights, IL

HVAC Maintenance
Term Contract
Post-Bid
Mount Prospect, IL 60056

Campus Building Automation System Upgrade
Results
$600,000 to $700,000 est. value
Chicago, IL 60621

Hvac Repair, Replacement, & Preventive Maintenance - 3 Year Contract
Bidding
Chicago, IL 60661

ABB HVAC Drivers
Post-Bid
Chicago, IL 60602

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

CPS Burroughs-Perez Annex-Pickard Ventilation Mitigation
Bidding
Chicago, IL 60608

Last Updated 05/07/2021 09:43 AM
Project Title

Building X: AHU-2 Fan Array Retrofit

Physical Address View project details and contacts
City, State (County) Palatine, IL   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes (but is not limited to) the following mechanical, electrical and structural work. 1.Mechanical work includes: a.Demolish the existing supply and return fan inlet cones/dampers. b.Replace the existing, large supply and return fans with a fan array configuration that includes a greater quantity of smaller direct drive fans with electronically commutated motors (ECMs). The ECMs are installed with an electronic control driver instead of variable frequency drives (VFDs). c.Perform functional cleaning of the major components of the AHU and provide commissioning services after all retrofit work is completed. Test and balance fan air flows. 2.Electrical work includes: a.Reuse or demolish feeders to existing supply and return fans that are being replaced. b.Provide feeders and associated overcurrent protection for new mechanical equipment. c.Install a harmonic filter at the electronic control driver to protect the AHU, as well as the other equipment fed from the associated electrical switchgear. 3.Structural work includes: a.Restrain new fan array system inside AHU-2. b.Structural supports and thrust restraints

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents