Similar Projects
Fourche Creek Water Reclamation Facility Fog Receiving Station and Digester Upgrades
Renovation
Bidding
Little Rock, AR 72206

Jamison and Arch Street Pump Station Modifications
New Construction
Bidding
Little Rock, AR 72209

Water Project
Post-Bid
Less than $166,000 est. value
Nashville, AR

Water System Improvements: Contract II - Water Line Extension and Chlorination Facility
Post-Bid
El Dorado, AR

Water Quality Demonstration
Results
Less than $1,412,520 est. value
Conway, AR 72032

Raw Water Supply Transmission Pipeline Contract 5
Results
Less than $11,200 est. value
Hot Springs, AR

Water System Improvements
Infrastructure
Bidding
Tillar, AR

Jefferson Street Pump Station Improvements
Post-Bid
Fulton, AR

Highway 9 Water Line Relocation
Results
Salem, AR

Wastewater Force Main and Pump Station Improvements
New Construction, Infrastructure
Bidding
$1,200,000 est. value
AR

Construction of the Highway 141 Water Line Relocation
Infrastructure
Post-Bid
Paragould, AR

Field Pump Station Improvements
New Construction
Results
Redfield, AR

Construction - Richland Creek Crossing
Infrastructure
Bidding
Fayetteville, AR

Wastewater System Improvements
Infrastructure
Post-Bid
Lake City, AR

Stone Links - Multi-Pipe Maintenance Rehabilitations
Infrastructure
Results
North Little Rock, AR

Reported 07/28/2021 12:00 AM
Project Title

Wastewater System Improvements - Contract Section II (Wastewater Treatment Facility)

Physical Address View project details and contacts
City, State (County) Alpena, AR   (Boone County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Section II - Furnish and install a biological nutrient removal wastewater treatment facility with an average annual design flow of 0.06 million gallons per day, including headworks, anaerobic, anoxic, and aeration basins, final clarifiers, u.v. disinfection equipment, sludge drying beds, post aeration basin, operations building, site pump station, and all valves, yard piping, flow control structures, electrical and controls equipment, and all appurtenances for a complete installation as shown on the Plans and as Specified.

Details

Sewage Treatment Plant, New Construction, Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents